My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BIG BEN, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
BIG BEN, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 4:15:50 PM
Creation date
7/28/2016 3:31:07 PM
Metadata
Fields
Template:
Contracts
Company Name
BIG BEN, INC.
Contract #
09-3213
Agency
Public Works
Council Approval Date
5/3/2016
Destruction Year
2021
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 09-3213 <br />CENTENNIAL PARK NEIGHBORHOOD WATER MAIN IMPROVEMENTS <br />Item <br />Bid Item <br />Unit <br />Qty <br />Unit Price <br />Amount <br />14.* <br />Combination Air Valve (As <br />Needed) <br />EA <br />10 <br />$ a, ca?b. fti <br />$C,, ll" <br />47 .621 <br />Vertical Offset (As <br />15.* <br />Needed, Prior Approval <br />EA <br />10 <br />$ 1961.615 <br />From The Engineer <br />Required) <br />16.* <br />Imported Backfill Material <br />Cy <br />100 <br />$ 4 8 <br />$ Z0OD°all <br />(As Needed} <br />17, <br />In -Line Insertion Valve <br />EA <br />10 <br />$ 71 0yr. du <br />18. <br />Prepare SWPPP <br />LS <br />1 <br />$ <br />$ OP <br />19.** <br />As -Built <br />LS <br />1 <br />$ 35 000 <br />$ 35.000 <br />TOTAL BID <br />$ ?, II Z, '�g 02 , 06 <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right <br />to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />** Fixed Price Bid Item <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />[Bidder signature must be shown on same page as total bid amount shown on table) <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within two hundred thirty (2301 working days after the commencement date stated in the <br />Notice to Proceed. The bidder also proposes to commence construction of the Work within thirty <br />(30) days after issuance of a Notice to Proceed, and to continue in a diligent and workman -like <br />manner without interruption, and to complete the construction thereof within the time specified <br />above. <br />The liquidated damages amount in lieu of the amount specified in Subsection 6-9 of the Standard <br />Specifications, shall be $1,000 per calendar day. <br />Nam( <br />Signa <br />Title <br />(if an <br />P-2 of P-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.