Laserfiche WebLink
Replace with: <br />This work shall include constructing AWWA C900, Class 235 DR18, PVC Water Main, and <br />appurtenances complete and in place, of the size and class, and to the alignment and grade <br />indicated on the plans. Fittings shall be gray or ductile iron conforming to AWWA Standards <br />as noted on the plans unless noted otherwise. <br />3. QUESTION: <br />Specifications page mentions all fittings to be Push On Joint and Flanged, but Plans call out <br />all fittings to be Mechanicals Joint and Flanged. <br />Response: <br />All Fittings shall be installed as noted on the construction plans. <br />4, QUESTION: <br />In Special Provision Section 7.03 page 32, 5`h paragraph, last sentence, it is stated <br />"Contractor shall supply new sewer manhole frame and covers, sewer cleanout frame and <br />covers, concrete rings and water valve pot frame, canister and lids per City standard plans." <br />Is this meant to mean we need to replace all these items on the project? Or is this meant to <br />mean to replace them as they are either damaged by our work or found to be damaged? <br />Response: <br />All utility covers, frames, concrete rings, canister and lids impacted by contractor activities <br />shall be replaced and adjusted to grade. <br />FOR THE CITY <br />fjn _iris <br />Edwin "William" <br />City Engineer <br />2of2 <br />SANTA ANA CITY COUNCIL <br />Miguel A, P.M. Vincent F. sanntento Michele Martinez Angelica Aalenua P. Da.d Benevides Roman Reyna Sat Tmajmo <br />Mayor Mayor Pro Tem, Ward 1 Ward Ward Ward Wards Ward <br />a1Lu1'd (]a i t y1 t - a.o mmadin ZaS ni- ,AgW aemez ua(dsama-anaJ9 dbeg�hgesfrdsama-a maro rrgy_na-@—U9A1- n .or sma ro ana-@na.aru <br />