Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 09-3213 <br />CENTENNIAL PARI{ NEIGHBORHOOD WATER MAIN IMPROVEMENTS <br />Item <br />Bid Item <br />Unit <br />city <br />Unit Price <br />Amount <br />14,* <br />Combination Air Valve (As <br />EA <br />10 <br />$ <br />$-___7O`,621 <br />Needed)' <br />_• <br />Vertical Offset (As <br />1S. * <br />Needed, Prior Approval <br />EA <br />10 <br />$165'0,60 <br />S S gid, & <br />From The Engineer <br />Required) <br />16.* <br />Imported Backfill Material <br />CY <br />100 <br />$ q6 to <br />(As Needed) <br />17. <br />In -Line Insertion Valve <br />EA <br />10 <br />$ " : . 410 <br />$ 7d 4WO nu <br />18. <br />pre are SWPPP <br />LS <br />1 <br />$ c7J <br />$a. <br />19.** <br />As -Built <br />LS <br />1 <br />$ M-00 <br />, <br />$ Ain <br />TOTALBID <br />$ ,'Z,46*Z•00 <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right <br />to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to Increase or decrease the quantity ofthis item accordingly, <br />** Fixed Price Bid item <br />TIME FOR COMPLETION OF IMPROVEMENTS AND IJOUIDATED�AG�S <br />[Bidder signature must be shown oa same page as total bid amount, shown on table) <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within two hundred thirty (230) woftg daA after the commencement date stated In the <br />Notice to Proceed. The bidder also proposes to commence construction of the Work within thirty <br />(30) days after issuance of a Notice to Proceed, and to continue in a diligent and workman -like <br />manner without interruption, and to complete the construction thereof within the time specified <br />above, <br />The liquidated damages amount in lieu of the amount specified in Subsection 6-9 of the Standard <br />Specifications, shall be $1,000 per calendar day. <br />Name <br />Signal <br />Title <br />(if an <br />P-2 of P-15 <br />