Laserfiche WebLink
. a Pipeline, <br />Project Name: Kana Project# 5162 — Sewer Replacement and Road Reconstruction <br />Location: Chapman Ave., Fullerton, CA <br />Description: Removing and replacing old sewer pipeline mainlines with new sewer main <br />for the City of Fullerton, along Chapman Ave and nearby side streets amidst <br />residential nei2hborhood. Installed approximately 4,000 LF of 8" VCP <br />Sewer Main installation; 150 LF of 8" Ductile Iron Sewer Main, sewer <br />manholes, lateral reconnections, removed existing VCP sewer main <br />pipeline, manholes, and sewer cleanouts; installed an Access Ramp per <br />APWA and access ramp retrofit; installed new sidewalk, curb a gutter and <br />cross gutters, alley returns, aggregate base, asphalt concrete, adjusted sewer <br />manholes and water valves to grade; installed street light conduit; carried <br />out Water Pollution Control, Traffic Control, Clear and Grob, Sheeting, <br />Shoring and Bracing. Note, This was a 100% import and 100% export <br />material soil project. <br />Total Man-hours: 5,733 <br />Owner: City of Fullerton, 303 W, Commonwealth Ave., Rm # 207, <br />Fullerton, CA 92832 <br />Project Manager: Eric Villa.gracia, (714) 738-6853 <br />Contract Amount: $1,415,119.45 <br />Start Date: 5/23/2011 <br />Date Of Com2letion: 9/15/2011 <br />Kana Pipeline Public Works Resume [Confidential] /Page 10 0£25 as of 1/2015. <br />