Laserfiche WebLink
Project Natne: Kana Project # 5822 — Irvine Regional Park — Water Main work <br />Location: Orange, CA (Jamboree X Santiago Cyn/ TG 800 J-2) <br />Description: 2 Phases of work: Total: PVC C900 CL 150 pipe —12" at 1,4751,13, 10" at <br />9,198 LF, 8" at 7,682 LF, 8" FH Lateral 1,682 LF, 6" office at 172 LF, <br />thrust blocks, bends, 6",8",10" and 12" gate valves, 29 fire hydrant <br />assemblies, and a connection to existing FH, lea, 2" Air Vacuum Relief <br />Valve Assemblies, 10" RPDA, temp connection to water main, water main <br />abandonments, ; Also includes, mobilization and demobilization, SWPPP, <br />Traffic Control, Stub Out to Lake, Connect existing Domestic Water, <br />Abandon Existing Water Lines, Remove and Replace Trench Asphalt <br />Pavement, SOC Trench Restoration, Potholing of existing Utilities, Arborist <br />and Tree Protection, Concrete Work, Testing <br />Total Man-hours: 7,744 total man hours; 6,651 original man-hours budgeted. <br />Owner: County of Orange, OCCR / OC Parks <br />1501 E. St. Santa Ana, CA 92705 <br />Project Manager: Doug Giltner, Sr, PM, (714) 425-8937; <br />doug giltnerQoccr.oc og v.com <br />Ref: Project No. OCCR12-007 /Additional Reference: 3`a Part F/T Onsite Inspector= Dennis A <br />Denibik ("DAD"), QSP, Construction Manager, Harris & Associates 34 Executive Park Suite 150, <br />Irvine, CA (949) 655-3900 / C (714) 318-8706 ddembik@.hirri-assoc.com <br />harri-assoc.com <br />Contract Amount: $ 2,392,181,90 <br />Start Date: 7/24/12 <br />Date Of Completion: 5/10/13 <br />Kana Pipeline Public Works Resume [Confidential] /Page 14 of 25 as of 1/2015. <br />