My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KANA PIPELINE, INC. (3)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
KANA PIPELINE, INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2016 3:49:18 PM
Creation date
7/28/2016 3:39:29 PM
Metadata
Fields
Template:
Contracts
Company Name
Kana Pipeline, Inc.
Contract #
16-6461
Agency
Public Works
Council Approval Date
5/17/2016
Destruction Year
2021
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL Exhibit A <br />PROJECT NO. 16-6461 <br />WARNER INDUSTRIAL COMMUNITY WATER AND SEWER IMPROVEMENTS <br />41.** <br />Imported Backfill Material <br />(As Needed) <br />CY <br />200 <br />$ d� <br />$ ea,60C7� <br />42 ** <br />Additional Potholing (As <br />EA <br />10 <br />$0nr� <br />Needed) <br />TOTAL BID <br />$! + S %, <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right <br />to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* Each mobilization item is limited to a maximum of 2.5% of the Total Bid. <br />** The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications, The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />(Bidder signature must be shown on same pass as total bid amount shown on table) <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within one hundred seventy-five (175) working days after the commencement date stated in <br />the Notice to Proceed. <br />• 25—Working days for exploratory potholing and data gathering <br />• 150—Working days for project construction <br />The bidder also proposes to commence construction of the Work within thirty (30) days after issuance <br />of a Notice to Proceed, and to continue in a diligent and workman -like manner without interruption, <br />and to complete the construction thereof within the time specified above. <br />The liquidated damages amount in lieu of the amount specified in Subsection 6-9 of the Standard <br />Specifications, shall be $2,000 per calendar day. <br />Name of Firm <br />Signature of BID[ <br />Title V�11Z1SJ4 k� <br />(if an individual, so state) <br />60r—'?O(z fes" tl 0.1' ( <br />P-4 OF P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.