My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KANA PIPELINE, INC. (3)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
KANA PIPELINE, INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2016 3:49:18 PM
Creation date
7/28/2016 3:39:29 PM
Metadata
Fields
Template:
Contracts
Company Name
Kana Pipeline, Inc.
Contract #
16-6461
Agency
Public Works
Council Approval Date
5/17/2016
Destruction Year
2021
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 16-6461 <br />WARNER INDUSTRIAL COMMUNITY WATER AND SEWER IMPROVEMENTS <br />P-2 OF P-17 <br />Furnish and Install Traffic <br />09 <br />10. <br />Rated Meter Box and <br />EA <br />81 <br />$ % 50 <br />Cover <br />11, <br />Construct Water Pipe <br />EA <br />11 <br />$ 2,3bc� <br />$ <br />Casing <br />CCN Inspection of <br />aC9 <br />12. <br />Existing Sewer Main (to <br />LF <br />2,800 <br />be left in place) Adjacent <br />to New Water Main <br />CCN Inspection of <br />13. <br />Existing Sewer Laterals (to <br />EA <br />34 <br />be left in place) Adjacent <br />to New Water Main <br />14 <br />Replace Damaged Traffic <br />EA <br />2 <br />$ (�(0�� � <br />$ <br />Loop Detectors <br />15. <br />Signing and Striping <br />LS <br />1 <br />$, <br />$ r%tl �qba a� <br />16. <br />Traffic Control <br />LS <br />1 <br />$ 5pca'� <br />$ tea, <br />17. <br />As -Built <br />LS <br />1 <br />$17,500 <br />$17,500 <br />18. <br />Prepare SWPPP <br />LS <br />1 <br />$ `2,6 <br />$ <br />19** <br />Combination Air Valves <br />EA <br />10 <br />$, <br />$�i��'� <br />(As Needed) <br />20.** <br />Vertical Offset (As <br />EA <br />10 <br />$� <br />o <br />$36.a0t�` <br />Needed) <br />21,** <br />Imported Backfill Material <br />CY <br />200 <br />$ 4D05 <br />$ 9,000 up. <br />(As Needed) <br />22.** <br />Potholing (As Needed) <br />EA <br />10 <br />P-2 OF P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.