My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KANA PIPELINE, INC. (3)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
KANA PIPELINE, INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2016 3:49:18 PM
Creation date
7/28/2016 3:39:29 PM
Metadata
Fields
Template:
Contracts
Company Name
Kana Pipeline, Inc.
Contract #
16-6461
Agency
Public Works
Council Approval Date
5/17/2016
Destruction Year
2021
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA Exhibit 2 <br />PROPOSAL <br />PROJECT NO, 16-6461 <br />WARNER INDUSTRIAL COMMUNITY WATER AND SEWER IMPROVEMENTS <br />BID PROPOSAL <br />T0: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM:�al 1 P�CI't111 ��1-IG . <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish <br />all material and do all the work required to complete the said work in accordance with said plans (if <br />any) and the specifications forthe unit price(s) or lump sums) set forth in the following schedule: <br />WATER MAIN IMPROVEMENTS <br />Item <br />Bid Item <br />Unit <br />Qty <br />Unit Price <br />Amount <br />1. <br />Mobilization -Water <br />LS <br />1 <br />$76, 5 1( <br />$i, <br />Main Improvements <br />2 <br />8" DR14 AWWA 0900 <br />LF <br />9,120 <br />$ } 0 � <br />$6157 6cZ7- <br />P.V.C. Water Main <br />Construct I" 1 Water <br />Doc <br />3. <br />Service and Connect to <br />EA <br />35 <br />$) (:>00" <br />$ Oc <br />Existing Meter <br />Construct 2" Water <br />c <br />4. <br />Service and Connect to <br />EA <br />60 <br />$ , o _ <br />$ i Os) 400 - <br />-Existing <br />Existing Meter <br />Construct 3" Water <br />po <br />W co <br />5. <br />Service and Connect to <br />EA <br />2 <br />$ x,-760 <br />$ j t, <br />Existing Meter <br />E <br />8" Resilient Wedge Gate <br />EA <br />11 <br />$ ) � ? <br />$ �, IC700 <br />Valve <br />Fire Hydrant Assembly <br />7. <br />(includes gate valve and <br />EA <br />18 <br />$ <br />_ <br />lateral pipe) <br />Construct 6" Fire Service <br />8. <br />and Connect to Existing <br />EA <br />30 <br />$ 22af1 <br />$1'b6,CJor7 <br />Piping <br />Construct 8" Fire Service <br />00 <br />of <br />9. <br />and Connect to Existing <br />EA <br />9 <br />$ ( loo — <br />�� <br />Piping <br />P-1 OF P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.