My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KANA PIPELINE, INC. (3)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
KANA PIPELINE, INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2016 3:49:18 PM
Creation date
7/28/2016 3:39:29 PM
Metadata
Fields
Template:
Contracts
Company Name
Kana Pipeline, Inc.
Contract #
16-6461
Agency
Public Works
Council Approval Date
5/17/2016
Destruction Year
2021
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Polido <br />MAYOR PRO TEM <br />Vicente Sarmiento <br />COUNCII_MEMBERS <br />Angelina An.ezcua <br />P. David Benavidos <br />Michele Martinez <br />Roman Reyna <br />Sal Tinajero <br />April 12, 2016 <br />ADDENDUM TWO <br />CITY OF SANTA ANA <br />20 Civic Center Plaza o P.O. Box 1988 M-313 <br />Santa Ana, California 92702 <br />(714) 847-5013 <br />wwwsanta-an.oi <br />AP.6" lyl Ytl I fflfC I <br />David Cavazos <br />C11 ATTORNEY <br />Sonia R. Carvalho <br />CLERK OF THE COUNCIL <br />Malta D. Holzer <br />SUBJECT: PROJECT NO. 16.6461: WARNER INDUSTRIAL COMMUNITY WATER <br />AND SEWER IMPROVEMENTS <br />The following changes/clarifications have been made to the specifications of the subject project: <br />1, TABLE OF CONTENTS <br />7-10 PUBLIC CONVENIENCE AND SAFETY <br />7-10.1.2 Outreach Program & Coordination <br />In addition to the standard notices, the contractor will be required to create and implement <br />an Outreach Program that consists of the following items that will be required prior to <br />commencement of construction. <br />• Assign or hire an Outreach Coordinator/Spokesperson and provide: Name, title, <br />phone number, and email. This person should be available during and after working <br />hours. <br />• Provide business Coordination Logs (sample). These logs will need to include the <br />business name, address, person contacted, date of contact, Purpose (sample) and <br />preferred days/times for construction to minimize impacts. It is the contractor's <br />responsibility to contact all businesses within the project limits, inform them of the <br />construction activities, and determine the times for construction that will minimize <br />impacts to access and public inconvenience. These efforts shall be coordinated with <br />the City Engineer or his representative to minimize businesses disruptions. The <br />inspector will verify coordination efforts on a regular basis. <br />SANTA ANA CITY COUNCIL. <br />Miguol A. Rolidp Urwlte Sarol'ento Michele id8;0ez Angelu Amemua P. Da id tlenavidea Raman Reyna Sal nnalero <br />Mayor Mayor r ro Te'nWs"I Ward 2 Ward v n w db Ward6 <br />V lli�(a-fig..i,ortli ao¢<as�,yl"an..uh ,y��t uyJealtRv...J P� liA&. ug(dj'411"'!>.'1:PrR tlbenw;da �iu;;a .P.nl$ rrolnx@glRLan@;WS aHn;11Rr4[�s.J,taa iaort <br />
The URL can be used to link to this page
Your browser does not support the video tag.