Laserfiche WebLink
Proiect Name: Kana Project # 5930 — Sunset Beach Water Main Replacement <br />Location: Huntington Beach, CA, CA (All between l I'', 12th' 14th, 15th, 16', 27th, <br />23'd, and 24th streets, from N Pacific Ave., to Pacific Coast Highway (PCH); <br />ref: TG 826 J7) <br />Description: Furnish and install 907 LF 6" and 240 LF 12" DR -14 PVC AWWA C900, a <br />12" bore of steel casing under CalTrans alley approach, 1" and 2" water <br />services and'/ and 1" water meter assemblies with meter box; removing <br />existing meter box; chlorination and testing of all new water main and <br />appurtenances, Asbestos Cement (AC) pipe legal disposal; 4" blow off <br />assemblies, remodel 4 sewer house connection laterals conflicting with <br />proposed waterline, remove and salvage exist FH including removing buy, <br />valve and appurtenances; conducted preconstruction survey of existing <br />home and street as required by contract docs., temp water services and blow <br />off, 4" temp hot tap to existing 6" AC Pipeline valve; all related traffic <br />control, Also includes mobilization, demobilization and cleanup as well as <br />alley rehabilitation for all sites. <br />Total Man-hours: 4,956 total hours; approx 200 working days to complete. <br />Owner: <br />City of Huntington Beach, 2000 Main Street, HB, CA 92648 <br />Proiect Manager: <br />Duane D. Wenthworth, CM, (714) 536-5517; dwentworth@surfcity- <br />hboore <br />(Lili Hernadez 714-374-5386 <br />Contract # 1412 Amount: <br />Contract $ 1,324,306.24 <br />Start Date: <br />11/13/12 <br />Date Of Completion: <br />5/18/2013 <br />Kana Pipeline Public Works Resume [Confidential] /Page 15 of 25 as of 1/2015. <br />