My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KANA PIPELINE, INC. (3)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
KANA PIPELINE, INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2025 12:03:50 PM
Creation date
7/28/2016 3:39:29 PM
Metadata
Fields
Template:
Contracts
Company Name
Kana Pipeline, Inc.
Contract #
16-6461
Agency
Public Works
Council Approval Date
5/17/2016
Expiration Date
6/30/2017
Destruction Year
2021
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proiect Name: Kana Project # 5930 — Sunset Beach Water Main Replacement <br />Location: Huntington Beach, CA, CA (All between l I'', 12th' 14th, 15th, 16', 27th, <br />23'd, and 24th streets, from N Pacific Ave., to Pacific Coast Highway (PCH); <br />ref: TG 826 J7) <br />Description: Furnish and install 907 LF 6" and 240 LF 12" DR -14 PVC AWWA C900, a <br />12" bore of steel casing under CalTrans alley approach, 1" and 2" water <br />services and'/ and 1" water meter assemblies with meter box; removing <br />existing meter box; chlorination and testing of all new water main and <br />appurtenances, Asbestos Cement (AC) pipe legal disposal; 4" blow off <br />assemblies, remodel 4 sewer house connection laterals conflicting with <br />proposed waterline, remove and salvage exist FH including removing buy, <br />valve and appurtenances; conducted preconstruction survey of existing <br />home and street as required by contract docs., temp water services and blow <br />off, 4" temp hot tap to existing 6" AC Pipeline valve; all related traffic <br />control, Also includes mobilization, demobilization and cleanup as well as <br />alley rehabilitation for all sites. <br />Total Man-hours: 4,956 total hours; approx 200 working days to complete. <br />Owner: <br />City of Huntington Beach, 2000 Main Street, HB, CA 92648 <br />Proiect Manager: <br />Duane D. Wenthworth, CM, (714) 536-5517; dwentworth@surfcity- <br />hboore <br />(Lili Hernadez 714-374-5386 <br />Contract # 1412 Amount: <br />Contract $ 1,324,306.24 <br />Start Date: <br />11/13/12 <br />Date Of Completion: <br />5/18/2013 <br />Kana Pipeline Public Works Resume [Confidential] /Page 15 of 25 as of 1/2015. <br />
The URL can be used to link to this page
Your browser does not support the video tag.