My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KANA PIPELINE, INC. (3)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
KANA PIPELINE, INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2025 12:03:50 PM
Creation date
7/28/2016 3:39:29 PM
Metadata
Fields
Template:
Contracts
Company Name
Kana Pipeline, Inc.
Contract #
16-6461
Agency
Public Works
Council Approval Date
5/17/2016
Expiration Date
6/30/2017
Destruction Year
2021
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMC <br />=�BiuKana Pipeline, Inc. <br />Proiect Name: Kana Project # # 5629 - The Preserve CFD #2003-3 <br />Location: Chino, CA (Pine Ave. at W. Preserve Loop; TG Pg#712 F-1) <br />Description: Scope of work includes sewer, domestic and reclaimed water and storm <br />drain installation; utility potholing; approximately 5,000 LF of 10", 12" and <br />15" VCP clay sewer, 18ea. 10" manholes, includes a 29" jack and bore steel <br />pipe casing underneath Pine Ave.; Domestic water scope of work includes <br />over 5,500 LF of 12" PVC C900CL200 pipe; over 10OLF of 8" PVC C900 <br />CL200 installation;l3ea. 12" gate valves and Zea 6" gate valves, bends, <br />blow off assemblies, flanges and a 30" blind flange, reclaimed water <br />installation of 3,000 LF of 8" PVCC900CL200 Purple pipe, 8" gate valves, <br />air vac assemblies, 12"x6"cross, 12"x6" reducer, fire hydrant assemblies, <br />Over 1,200 LF of 24", 42" and 60" RCP storm drain pipe, catch basins, <br />junction structures, Clear and grub, SWPPP Implementation, Traffic <br />Control; <br />Total Man-hours: In Progress <br />Owner: LCD Homecoming at The Preserve, 1156 N. Mountain Ave., <br />Upland, CA 91786 / Lucas Companies, <br />Proiect ManaEer: Jason Miller (909) 946-7521; jason.millerglewisop.com <br />Contract Amount: $ 1,406,352.00 <br />Start Date: 12/19/2011 <br />Date Of Completion: 9/12/2013 <br />Kana Pipeline Public Works Resume [Confidential] /Page 17 of 25 as of 1/2015. <br />
The URL can be used to link to this page
Your browser does not support the video tag.