My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PALP INC. DBA EXCEL PAVING COMPANY (5)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
PALP INC. DBA EXCEL PAVING COMPANY (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 2:01:16 PM
Creation date
7/28/2016 3:45:50 PM
Metadata
Fields
Template:
Contracts
Company Name
PALP INC. DBA EXCEL PAVING COMPANY
Contract #
15-6606
Agency
Public Works
Council Approval Date
5/17/2016
Destruction Year
2016
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM NO, ONE <br />CITY OF SANTA ANA PROJECT NO. 15-6606 <br />PROPOSAL <br />PROJECT" NO. 15-6606: 3"" STREET TRAFFIC CALMING (FAID# U58DP005861) <br />BID PROPOSAL <br />TO: CITY COUNCIL, OF THE CITY OF SANTA ANA <br />FROM: NP, WCMA <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete (lie said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />P-1 <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Unclassified Fxcavation <br />Cy <br />80 <br />$ <br />$ <br />2 <br />AC Pavement* <br />TN <br />55 <br />$ <br />$ <br />9 <br />3 <br />Construct PCC Sidewalk (T=4")* <br />SP <br />825 <br />$ <br />$ Z '2 <br />Y <br />4 <br />Constnwt PCG Curb Ramp* <br />SF <br />1140 <br />$ O "' <br />$ r%f <br />5 <br />Construct PCCDriveway (T=G")* <br />5F <br />55 <br />$ <br />I►oD <br />6 <br />Construct PCC Curb only (B-1)* <br />LF <br />260 <br />$ <br />$ <br />7 <br />Construct PCC (7urb and Clutter (A-2-6)* <br />LF <br />SD <br />$ <br />$ <br />B <br />Construct AC DIIfF Traffic Circle(Ctub <br />=G"}* <br />LF <br />65 <br />$ <br />Face <br />9Construct <br />aad Pravide BrickPaver Band* <br />SF <br />70 <br />$ <br />$ <br />IU <br />Adjust Manhole Frame and Cover to Grade <br />FA <br />1 <br />X000® <br />layao �. <br />11 <br />Adjust water valve Frarne and Cover to <br />Grade <br />EA <br />1 <br />$ <br />tp 0 — <br />$ <br />5W <br />12 <br />Adjust Pull Box to Grade _ <br />EA <br />1 <br />$ <br />(o0a ` <br />$ <br />(006 — <br />13 <br />Landscaping <br />LS <br />1 <br />$ <br />Doors" <br />oODt�� <br />4 <br />Landscape Maintenance (60 calendar _ <br />days): <br />LS <br />I <br />$ <br />199 <br />$ <br />15 <br />Funtish and Install Soil* <br />CY <br />20 <br />$ ��-, <br />$1 16D— <br />0Dr <br />P-1 ofP-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.