My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20B - AA - YMCA RENOVATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
08/16/2016
>
20B - AA - YMCA RENOVATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2016 4:31:50 PM
Creation date
8/11/2016 3:10:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20B
Date
8/16/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />Exhibit B <br />DATE & TIME OPFNBD: 7/28/2016; 2;00'59 PM <br />PROJECT NO 16 -6876• FORMER YMCA - MATERIALS ABATEMENT AND ENVIRONMENTAL RENIEDIATION <br />BIDDER. <br />CITY <br />BID BOND <br />Matrix Environmental, Inc. <br />Long Beach <br />Yes <br />UNIT <br />TOTAL <br />Roof (includes all levels with asphalt slotting) <br />'Rolled roofing fields, felts and <br />associated mastics <br /># <br />BID ITEMS <br />Description <br />UNIT <br />QTY <br />COST <br />COST <br />I <br />Mobitization /Demobilization(no more than 10 54o) <br />$ 8.67 <br />LS <br />$ 1.00 <br />$ 120,000.00 <br />$ 120,00100 <br />2 <br />Permits <br />$ 14.00 <br />LS <br />$ 1.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />3 <br />Windows Panes <br />$ 500.00 <br />LS <br />$ 1.00 <br />$ 38,000.00 <br />$ 38,000.00 <br />4 <br />Board Up Windows <br />$ 3.25 <br />EA <br />$ 30D0 <br />$ 413.33 <br />$ 12,39990 <br />5 <br />Pool Water Analysis, Removal and Disposal and <br />Bottom Clean Up <br />I <br />IS <br />$ L00 <br />$ 7,506.00 <br />$ 7,500.00 <br />6 <br />Drain Cleaning <br />$ 50.83 <br />LS <br />$ 1.00 <br />$ 5,000.00 <br />$ 5,00000 <br />7 <br />Polyethylene Sheathing Around Scaffolding <br />$ 11.00 <br />LS <br />$ 1.00 <br />$ 25,000.00 <br />$ 25,000.00 <br />8 <br />Building Security <br />$ 1200 <br />LS <br />I $ 1.00 <br />$ 50,000.00 <br />$ 50,000.00 <br />J etallLtrrs 3 - 8- <br />.$._ X2611.3"19 90 <br />Snitd Ituns 9 - 24 <br />Page 1 of 3 <br />20B-42 <br />x,4'„{,28_(,1138.36 <br />9 <br />Roof (includes all levels with asphalt slotting) <br />'Rolled roofing fields, felts and <br />associated mastics <br />SF <br />$ 6,000.00 <br />$ 32.50 <br />$ 195,000.00 <br />10 <br />Basement throughout walls <br />Mirror Mastic <br />SF <br />$ 15000 <br />$ 8.67 <br />$ 1,300.50 <br />It <br />Basement door at youth shower access to pool and <br />youth restroonr <br />Blue ceramic tile and <br />mortar,grout <br />SF <br />$ 75.00 <br />$ 14.00 <br />$ 1,050.00 <br />12 <br />Basement at boiler roam piping and at let floor <br />storage at abandoned water heater <br />Gaskets <br />SF <br />$ 3.00 <br />$ 500.00 <br />$ (,500.00 <br />13 <br />Basement [at floor throughout <br />Plaster walls and ceilings <br />SF <br />$ 24,00000 <br />$ 3.25 <br />$ 78 000.00 <br />W <br />I at floor storage between gym and Xerox room at <br />abandoned heater unit <br />Heater gasket <br />SF <br />$ 5.00 <br />$ 150.00 <br />$ 750.00 <br />15 <br />1st floor closet at staff area <br />12" x I2" White VFT and <br />mastic <br />SF <br />$ 12.00 <br />$ 50.83 <br />$ 609.96 <br />16 <br />fat floor /basement Gymnasium south and east <br />stairs to basement <br />Non - slip floor oovering/stair <br />tread and tan mastic <br />SF <br />$ 140.00 <br />$ 11.00 <br />$ 1,540,00 <br />17 <br />1st floor office east of gymnasium (near staircase) <br />Ceramic ti'.e grout and matter <br />SF <br />$ 60.00 <br />$ 1200 <br />$ 720.00 <br />18 <br />l st floor kitchen on west wall <br />Paper HVAC boot wra <br />LF <br />$ 5.00 <br />$ 100.00 <br />$ 500,00 <br />19 <br />Ist floor kitchen on west wall from basement level <br />ceiling through roof, and storageroom ceiling <br />Cementitous vent pipes <br />SF <br />$ 80.00 <br />$ 6.56 <br />$ 524.80 <br />20 <br />2nd floor room 227 <br />Baseboard and mastic <br />LF <br />$ 45.00 <br />$ 2.22 <br />$ 99.90 <br />21 <br />Southeast interior stairwell at 2nd /3rd flight, and <br />on abandoned gymnasium at room 201 <br />White plaster type dollop <br />adhesive <br />SF <br />$ 21D0 <br />$ 12.00 <br />$ 240.00 <br />Soutinvest Bulldhr„ <br />22 <br />interior wall base <br />Base cove mastic <br />LF <br />$ 150.00 <br />$ 8.00 <br />$ 1,200.00 <br />23 <br />Roof Patches, seams and penehation <br />Silver paint and too£ mastic <br />SF <br />$ 45.00 <br />$ 15.56 <br />$ 700,20 <br />Coneretc Block Building <br />24 Roof Patches, seams and penetration Roof mastic SF $ 2100 1 $ 15.15 $ 303.00 <br />Snitd Ituns 9 - 24 <br />Page 1 of 3 <br />20B-42 <br />x,4'„{,28_(,1138.36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.