Laserfiche WebLink
CITY OF SANTA ANA <br />PROJECT NO 16 -6876• FORMLR YMCA - MATERIALS ABATEMENT AND EN39RONMENTAIL 'REMFBIATION <br />Exhibit B <br />BIDDER <br />Matrix Environmental, Inc. <br />55 <br />Exterior and inferior throughout <br />Window glezing putty <br />EA <br />S 300,00 <br />$ 410.27 <br />$ 123,08t.00 <br />56 <br />Basement at southweststafrwell at bottom landing <br />Fibrous paper (insulation) <br />SF <br />$ 10.00 <br />$ 35.80 <br />$ 358.00 <br />debris <br />57 <br />pesment youth locker at north storage stair area <br />Green floor tile and black <br />SF <br />$ 5.00 <br />$ 14.00 <br />$ 70.00 <br />mastic ( debris) <br />58 <br />Basement wall$ and ceilings, flooring piles <br />Drywall and joint compound <br />SF <br />$ 5,60090 <br />$ 175 <br />$ 15,400.00 <br />(and debris) <br />59 <br />Basement at pipe chase closet (men's locker out of <br />Corrugated insulation <br />sauna), pipe chase east of men's shower <br />SF <br />$ 15100 <br />$ 55.13 <br />$ 826.95 <br />(northeast of sauna) <br />60 <br />Throughout the basement and first floor locations <br />Miscellaneous debris on <br />I3 <br />$ I'm <br />$ 50,000.00 <br />$ 50,000.00 <br />ground and surfaces <br />61 <br />let floor southeast conference and office area ( and <br />Drywall with joint compound <br />acticity center cast lobby), nutrition and kitchen <br />walls and ceilings <br />SF <br />$ 2,000.00 <br />$ 175 <br />$ 5,500,00 <br />build out <br />_ <br />62 <br />1st floor antral area build out (nutrition, kitchen, <br />Plaster (button board - <br />SF <br />$ 3,000.00 <br />$ 2,75 <br />$ 8,250.00 <br />Storages, office and Xerox areas) <br />planter /drywall) walls <br />63 <br />1 at floor at gymnasium floor <br />Corrugated paper insulation <br />SF <br />$ 10000 <br />$ 25.00 <br />$ 2,500.00 <br />debris <br />64 <br />I at floor gymnasium at upper cat walk/running <br />Non- slip floor coating on <br />SF <br />$ 000.00 <br />$ 2.00 <br />$ 3,000.00 <br />balcony <br />wood floor <br />65 . <br />1 st floor acticity and nutrition room, mixed with <br />Pipe insulation debris on <br />burned, moldy fallen ceiling materials <br />ground and above piping <br />L$ <br />$ 1,00 <br />$ 697.00 <br />$ 697.00 <br />66 <br />2nd and 3rd floor west stair landings <br />9, inch grey floor tile and <br />8F <br />$ 50.00 <br />$ 12.00 <br />$ 600.00 <br />mashc <br />67 <br />2nd floor west stair lauding waft build-mat (debris <br />Drywall with joint compound <br />in stairwell closet) <br />walls and ceilings <br />Sir <br />$ 340.00 <br />$ 2.75 <br />$ 935.00 <br />68 <br />2nd floor restroom coiling (debris at ceiling cook <br />Corrugated paper insulation <br />SF <br />$ 40.00 <br />$ 43.16 <br />$ 1,726.40 <br />and men's and women's shower area) <br />debris <br />69 <br />2nd and 3rd floor ceiling adjacent to restroom and <br />TSl pipe <br />pipe chase; throughout north central roof area <br />(2ndi3rd level roof), north roof and wall area (north <br />LCr <br />$ 150,00 <br />$ 21,26 <br />$ 3,189,00 <br />side of gym at 2nd and ground level), Debris <br />observed below damaged elbow areas <br />70 <br />2nd and 3rd floor ceiling adjacent to restroom and <br />Pipe elbows Insulation (and <br />pipe chase; throughout north central roof area <br />debris) <br />(2nd /3rd level root), north roof and well area (north <br />EA <br />$ 40.00 <br />$ 28.85 <br />$ 1,154,00 <br />side of gym at 2nd and ground level), Debris <br />observed below deranged elbow areas <br />71 <br />3rd floor men's and women's restroom walls, 3rd <br />Drywall with joint compound <br />fact storage closet ceiling <br />(Including debris) <br />SF <br />$ 340.00 <br />$ 2.75 <br />$ 935.00 <br />Soutlaw'est Building <br />72 <br />Northeast 100,11 on floor <br />Corrugated insulation debris <br />SF <br />$ 3.00 <br />$ 16.67 <br />$ 50.01 <br />73 <br />Ceiling/F10or <br />Cementitious EiLng <br />I SF <br />1 $ 3,00 <br />$ 16.671 <br />$ 50.01 <br />j, Latgl It ig ng,5„5�f7' S - ..Al.a lsL! <br />Page 3 of 3 <br />