My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - TOWING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
08/16/2016
>
25F - AGMT - TOWING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2016 4:38:00 PM
Creation date
8/11/2016 3:56:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
25F
Date
8/16/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O. PERFORMANCE DURING INCLEMENT WEATHER OR DISASTERS <br />The Contractor acknowledges that the services provided under this contract are <br />integral to the operations of the City of Santa Ana and the Santa Ana Police <br />Department. Therefore, the Contractor agrees to perform the duties of this <br />contract regardless of weather or other adverse conditions including, but not <br />limited to, any disasters whether man -made or acts of God. <br />2. During periods of inclement weather or disaster, the Contractor shall agree to <br />adjust staffing levels to meet the increased demands for service during these <br />times. <br />3. Should the Contractor be unable to fulfill their responsibilities under the <br />conditions described in this section, the Contractor shall be responsible for any <br />and all costs incurred by the City should the need to hire outside contractors <br />become necessary to meet the needs of the Police Department due to the <br />Contractor's default. <br />P. PROTECTION OF THE PUBLIC AND DAMAGES TO EXISTING <br />STRUCTURES <br />1. The Contractor shall exercise due care and caution at all times for the protection of <br />all persons and property. All fines, penalties and/or repair charges resulting from <br />the Contractor's actions shall be the sole responsibility of the Contractor. <br />2. Understanding that the Contractor will respond to calls involving traffic collisions <br />or traffic hazards, and pursuant to CVC § 22513, the Contractor shall only place or <br />use equipment to block vehicle traffic lanes or render assistance to a motorist while <br />exercising due care for the safety of the tow truck driver, the motorist and the <br />motoring public. Tow hock drivers should be trained in scene management in <br />accordance with this section. The Contractor shall ensure that all appropriate traffic <br />safety warning devices are utilized as deemed necessary. <br />Contractors will be required to respond to calls where vehicles have collided with <br />other objects and may have already caused damage to varying degrees. The <br />methods proposed _by the Contractor for towing and recovery services shall be <br />reasonable and consistent with industry standards, best practices, and in a manner <br />that shall not cause unnecessary additional harm, deface or damage any City or <br />private property. In the event that damage to the City's right -of -way or private <br />property has occurred due to the negligence of the Contractor, the Contractor shall <br />be solely responsible for its repair or replacement in excess of the amount covered <br />by the required insurance. <br />25F -54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.