<br />4, Appendix A, Definition of Bid Items, Page 1, Bid Item No, 1 - Mobilizatlom revise
<br />section to read as follows:
<br />"Payment for "Mobilization,"will be made on a lump sum (L.S.) basis, as specified in the.
<br />Bidder's Proposal, which shall include all costs for furnishing all labor, profit, taxes,
<br />fees, incidentals, materials, equipment and permits/authorization for use of a
<br />construction staging area(s), erosion control, signage and equipment, construction.
<br />fending, provide temporary utilities including but not limited to power and construction
<br />water and implement, and perforin all the work involved and required perform the work
<br />per plan and specification."
<br />5. Appendix A, Definition of Bid Items, Page 2, Bid Item No. 4 - Drainage and Domestic
<br />Water: revise section to read as follows:
<br />"Payment for 'Drainage and Domestic Water " will be made on a lump (L, S.) basis, as
<br />specified in the Bidder's Proposal, which shall include all costs for furnishing all labor,
<br />profit, taxes, materials, tools, equipment, and incidentals, and performing all the work
<br />involved and required to place, furnish and install fiber roll, furnishing and Install gravel
<br />bag, construction entrances, traffic control cost, storm drain inlet protection,
<br />trench/excavate/shore, place bedding, furnish equipment and backfill/compact
<br />trenching, furnish and Install all pipe to connect to catch basins and area drains
<br />including play area and Maxwell deep well systems, furnish and install two 1"hot tap
<br />service lines within Memory Lane, (2) 1"meters pressure reducer backflow assembly
<br />(backflow for Irrigation meter to be included in irrigation bid Item), furnish and install all
<br />PVC schedule 80 pipe and fitting,concrete thrust blocks, backfill, compact sterilize and
<br />disinfect pipe and complete hydrostatic test and provide utility connections in
<br />accordance with the plans, details and specifications."
<br />6, Appendix A, Definition of. Bid Items, Page 2, Bid Item No. 6 - Lighting Fixtures and
<br />Footings: add the following sentence to the section:
<br />"This item does not include fixtures for picnic shelter."
<br />7, Appendix A, Definition of Bid Items, Page 2, Bid Item No. 7 — Electrical Services,
<br />Controls, Trenching and Conduit: add the following sentences to the section:
<br />"This item does not Include electrical service for picnic shelter."
<br />8. Appendix A, Definition of Bid Items, Page 3: add Bid Item No. 7a — Electrical Service
<br />Connection to SCE Point of Connection: add the following section:
<br />Bid Item No, 7a- Electrical Service Connection to SCE Point of Connection:
<br />Payment for "Electrical Service Connection to SCE Point of Connection" will be made
<br />on a linear foot (L. F.) basis, as specified in the Bidder's Proposal, which include all
<br />costs for furnishing all labor, profit, taxes, materials, tools, equipment, and incidentals,
<br />required and performing all work involved and required to provide trenching, provision