My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RESO 2016-33_3300-3398 S Bristol St (Parking Variance)
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2016
>
RESO 2016-33_3300-3398 S Bristol St (Parking Variance)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2016 10:17:39 AM
Creation date
8/17/2016 10:17:35 AM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Conditions of Approval for Variance No. 2016-06 <br />Should the Planning Commission approve Variance No. 2016-06, the approval is <br />subject to compliance, to the reasonable satisfaction of the Planning Manager, <br />with all applicable sections of the Santa Ana Municipal Code, the California <br />Administrative Code, the California Building Standards Code and all other <br />applicable regulations. <br />The applicant must comply in full with each and every condition listed below prior <br />Lo exercising the rights conferred by this variance. <br />The applicant must remain in compliance with all conditions listed below <br />throughout the life of the variance. Failure to comply with each and every <br />condition may result in the revocation of the variance. <br />A. Planning Division <br />1. All proposed improvements must conform to the Site Plan Review <br />approval of DP No. 2015-53 and the staff report exhibits. <br />2. Any amendment to this variance must be submitted to the Planning <br />Division for review. At that time, staff will determine whether <br />administrative relief is available or the variance must be amended. <br />3. Prior to the issuance of building permits, all donation bins must be <br />removed from the premises. <br />4. Prior to the issuance of building permits, a final landscape plan <br />must be submitted. The plan shall include the location and type of <br />new landscaping to be installed as well as details on the irrigation <br />system to ensure continued maintenance of the landscaping. <br />5. Prior to occupancy of the building, following items shall be <br />completed: <br />a. The parking lot shall be repaired, repaved and restriped to City <br />standards; <br />b. A minimum of 10 bike racks shall be installed throughout the <br />project site; and, <br />c. All dead and/or missing landscaping shall be replaced. <br />Resolution No. 2015-33 <br />Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.