My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MIDORI GARDENS 6 - 2016
Clerk
>
Contracts / Agreements
>
M
>
MIDORI GARDENS 6 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2022 12:44:03 PM
Creation date
9/13/2016 2:39:08 PM
Metadata
Fields
Template:
Contracts
Company Name
MIDORI GARDENS
Contract #
A-2016-151
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
6/21/2016
Expiration Date
6/30/2018
Destruction Year
2023
Notes
Missing E&O
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
systems (i.e. utility lines) and take responsibility for taking reasonable precaution when <br />working in these areas. <br />13.3 Contractor shall call Underground Alert (800) 422-4133) at least two working days prior <br />to digging for line locations. Any damage or problems shall be reported immediately to <br />the Director's Representative and the City of Santa Ana. If the Contractor discovers <br />something unexpected or a unique problem occurs, he should stop work and immediately <br />contact an authorized Director's Representative for a timely resolution of the problem. <br />14.0 SUBSTITUTIONS <br />14.1 Whenever a specific type of material is specified, no substitutions shall be allowed <br />without written consent of the SAPRF representative. <br />15.0 CERTIFICATION & APPLICATION OF MATERIALS <br />15.1 All materials shall be delivered on the site in original containers. Materials shall be <br />subject to inspection by the Director's Representative. The Director's Representative <br />will not approve materials not meeting the SAPRF standards, and Contractor shall return <br />any such non -satisfactory items at his/her cost. <br />15.2 No materials shall be applied prior to the Director's Representative verifying the <br />specified quantities of materials. Furthennore, should the Contractor apply materials <br />before the Director's Representative verifies correct materials and quantities, the <br />Contractor shall not receive credit for the applied materials. The Contractor shall then <br />reorder and deliver the materials, thereby not receiving credit for the applied materials. <br />16.0 CONTRACTOR NEGLECT <br />16.1 Any damage to the City of Santa Ana, SAPRF, or private property, which has been <br />determined to be due to the Contractor's neglect, shall be corrected at no additional cost <br />to the City of Santa Ana or the SAPRF. <br />17.0 CONSTRUCTION EQUIPMENT <br />17.1 The Contractor shall take all necessary precautions for safe operation of his equipment <br />and the protection of the public from injury and damage from such equipment. <br />18.0 SOUND CONTROL REQUIREMENTS <br />18.1 The Contractor shall comply with all local sound control and noise level rules, <br />regulations and ordinances that apply to any work performed pursuant to the Contract. <br />Each internal combustion engine used for any purpose on the job or related to the job <br />shall be equipped with a muffler of a type recommended by the manufacturer of such <br />equipment. No internal combustion engine shall be operated on the project without said <br />muffler. Full compensation for conforming to the requirements of this section shall be <br />considered as included in the prices paid for the various contract items of work involved <br />and no additional compensation will be allowed therefore. Sounds, such as loud music, <br />City of Santa Ana RFP 16-063 <br />Page 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.