Laserfiche WebLink
EXHIBIT C <br />ARTERIAL PAVEMENT MANAGEMENT PROGRAM <br />FINAL PROJECT REPORT FORM <br />Date <br />OCTA <br />Instructions <br />The responsible agency should fill out the following: 1) Final Project Form, 2) Final Cost, 3) Certificate of <br />Completion. Page 4, the OCTA Staff Verification will be filled out by OCTA staff. In addition, the agency must <br />attach before (if available) and after photographs of the project site and the address or location of the site under <br />the Location and Scope of work section. <br />Location and Scope of Work <br />Verification of Match <br />(Actual Expenditures) <br />-P nnal Rdafrh <br />Phase <br />(ENTER <br />SOURCE ) <br />(EER, <br />NT <br />SOURCE <br />(ENTER= <br />SOURCE ) <br />RSTP , <br />Other <br />OCTA <br />Funding'Total <br />Final Environmental Document <br />En ineerin <br />$ <br />$ <br />$ - <br />$ - <br />$ - <br />$ <br />Ri ht -of-Wa <br />$ <br />$ <br />$ - <br />$ - <br />$ - <br />$ <br />Construction <br />$ - <br />$ <br />$ <br />$ <br />$ <br />$ <br />Total <br />$ - <br />$ <br />$ <br />$ <br />$ <br />$ <br />Phase v <br />Proposed <br />Actual <br />Draft Environmental Document <br />Final Environmental Document <br />Begin Design Engineering <br />Plans, Specifications, and Cost Estimates com fete <br />Start Right-of-Way Acquisition <br />Right-of-Way Certification <br />Read to Advertise <br />Award Construction <br />Project Completion (open for use) <br />r1- <br />Match <br />Rate l <br />0 % <br />Page 1 <br />