Laserfiche WebLink
Contract Award for Walnut Pump Station Building Update <br />September 20, 2016 <br />Page 2 <br />miscellaneous site electrical improvements. Other improvements include new fencing, concrete <br />practice tennis wall, a carport, asphalt paving, drainage, and drought - tolerant landscaping. Once <br />completed, the improvements will modernize the pump station, enhance the aesthetics of the <br />surrounding area, and keep this important facility operational, ensuring potable water reliability to <br />our community. <br />A Notice Inviting Bids was advertised on May 13 and 17, 2016, and bids were opened on July 28, <br />2016. The following is a summary of the bid invitations mailed and received, and the bid results: <br />Contractor Participation Data <br />Santa Ana contractors receiving notices <br />15 <br />Contractors requesting bidding documents <br />45 <br />Bids received <br />7 <br />Bids received from Santa Ana contractors <br />0 <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID <br />1 <br />Arnaz Engineering Contractors, Inc. <br />Anaheim <br />$3,596,000.00 <br />2 <br />Environmental Construction, Inc. <br />Woodland Hills <br />$4,640,897.80 <br />3 <br />Pacific Hydrotech Corp. <br />Perris <br />$5,150,400.00 <br />4 <br />Kiewit Infrastructure West Co. <br />Santa Fe Springs <br />$5,660,000.00 <br />5 <br />Pyramid Building & Engineering, Inc. <br />Hesperia <br />$5,942,476.00 <br />6 <br />Kana Engineering Group, Inc. <br />Rancho Cucamonga <br />$6,078,293.85 <br />7 <br />G2K Construction, Inc. <br />Agoura Hills <br />$6,161,000.00 <br />A total of seven bids were received and all were considered responsive. Arnaz Engineering <br />Contractors, Inc., submitted the lowest responsive bid in the amount of $3,596,000 (Exhibit 2). <br />The Arnaz Engineering Contractors, Inc., bid is significantly lower than the engineer's estimate of <br />$4,517,000, and significantly lower than other competing bids. Therefore, staff performed a <br />thorough bid analysis, contacted the contractor to confirm the itemization, and verified the bid <br />bond to guarantee the bid price to the City. Based on the bid analysis and a contractor's <br />reference check, staff recommends awarding the construction contract to Arnaz Engineering <br />Contractors, Inc., in the amount of $3,596,000 (Exhibit 3). <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this item supports the City's efforts to meet Goal #6 - Community Facilities & <br />Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City <br />assets), Strategy C (invest resources and technology to extend the service life of existing <br />infrastructure to protect the City's investment and support a high quality of life standard). <br />23A -2 <br />