Laserfiche WebLink
MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Viconte 8armiento <br />COUNCILMEMBERS <br />Angelica Amezcua <br />P. Oavid Benavldes <br />Michele Martinez <br />Ronan Boyne <br />Sal Tinatero <br />July 22, 2016 <br />ADDENDUM FIVE <br />1 OF SANTA ANA <br />20 Civic Center Plaza + P.O. Box 1988 M -30 <br />Santa Ana, California 92702 <br />(714) 647 -5013 <br />W y� <br />CITY MANAGER <br />David Cavazos <br />CITY ATTORNEY <br />Sonia R, Carvalho <br />CLERK Of THE COUNCL. <br />Maria O. Huizar <br />c cfcrG edged <br />Ali Yazdanshenas <br />Arnaz Engineering <br />Contractors, Inc. <br />SUBJECT: PROJECT NO, 11 -5412: WALNUT PUMP STATION BUILDING UPGRADE <br />The following changes /clarifications have been made to the specifications of the subject <br />project: <br />1. PROJECT SUBMITTALS <br />Add; Electronic Submittal Platform and Procedure <br />It is the contractor's responsibility and to transmit all shop drawings, data submittals, and <br />project closeout documentation via the City's electronic platform. The general contractor will <br />be required to attend training session /s and or obtain the necessary training on the usage <br />and procedures for all transmittal documentation. <br />a. Submittal Preparation - Contractor may use any or all of the following options: <br />i. Subcontractors and Suppliers provide electronic (PDF) submittals to <br />Contractor via the Submittal Exchange website. <br />ii. Subcontractors and Suppliers provide paper submittals to General <br />Contractor who electronically scans and converts to PDF format. <br />IT Subcontractors and Suppliers provide paper submittals to Scanning <br />Service which electronically scans and converts to PDF format. <br />b. Contractor shall review and apply electronic stamp certifying that the submittal <br />complies with the requirements of the Contract Documents including verification <br />of manufacturer / product, dimensions and coordination of information with other <br />parts of the work. <br />c. Contractor shall transmit each submittal to City using the Submittal Exchange <br />website, www.submittalexchange.com. <br />d. Engineer review comments will be made available on the Submittal Exchange <br />website for downloading. Contractor will receive email notice of completed <br />review. <br />e. Distribution of reviewed submittals to subcontractors and suppliers is the <br />responsibility of the Contractor. <br />23A -34 <br />Sol i e p. <br />Wads <br />�m eC?s._ga.anp oo <br />SANTA ANA CITY COUNCIL <br />rated A. lelide <br />Vloenla SiminM <br />Mictrela MaNnea <br />as"WaAreinmo <br />Pnaed Eire.,de, <br />NCman FM,ma <br />Mayor <br />Moyer Pro Tam, Word 1 <br />Wow <br />Werd3 <br />Wa1d.1 <br />Wards <br />nmmlrlioey2 <br />23A -34 <br />Sol i e p. <br />Wads <br />�m eC?s._ga.anp oo <br />