Laserfiche WebLink
CITY OF SANTA ANA Addendum One <br />DEFINITION OF BID ITEMS 8/1�I11 s <br />PROJECT NO.. 162651 <br />CIVIC CENTER RE-CAULKING EXPANSION JOINTS AT PLAZA OF TETE FOUNTAINS <br />AND PLAZA OF THE FLAGS <br />DEFINITION OF BID ITEMS <br />The unit prices paid for the items listed in the Contractor's Proposal as defined herein shall be <br />considered full compensation for furnishing all labor, materials, tools, and equipment, and doing <br />all work involved to furnishing and installing the materials complete and in place, In accordance <br />with the details shown on the Plans, as spewed herein, and as directed by the Engineer, <br />All Incidental work which Is neither shown on the Plans not otherwise speeded, and which Is <br />necessary to complete the Improvements as shown on the Plans and as specyied in the Contract <br />Documents (defined in the Contract/Agreement), shall be furnished and installed as though such <br />work were shown on the Plans or speo0ed in the Contract Documents, and no additional <br />compensation shall be allowed therefore. <br />The scope of work includes, but Is not limited to, each bid item listed In the Contractor's <br />Proposal and as described In the, following, <br />JOINT SLALANT ITEMS <br />Bid Item No. I - Slkaflox 2C SL Joint Sealant (Limestone color) & Backer Rod <br />Payment for Sikaflex 2C SL Joint Sealant (Limestone color) & Backer Rod shall be at the <br />contract unit price bid per linear feet listed in the Bid Proposal, and shall include full <br />compensation for doing all work, including removing any existing material in joints, furnishing <br />all materials, labor, equipment, tools, and incidentals as required and no additional compensation <br />will be allowed therefore, Contractor to verify widths of existing joints prior to bid. <br />.Bid Item No. 2 - Sikaflex Primer 429 <br />Payment for Sikaflex Primer 429 shall be at. the contract unit price bid per linear feet listed hi <br />the Bid Proposal, and shall include full compensation for doing all work, including furnishing all <br />materials, labor, equipment, tools, and incidentals as required and no additional compensation <br />will be allowed therefore. Contractor to verify widths of existing joints prior to bid. <br />Bid Item No. 2 - Temporary Construction Sign <br />Payment for Temporary Construction Signs shall be at the contract unit price bid per each unit <br />listed in the Bid Proposal, and shall include full compensation for doing all work, including <br />furnishing all materials, labor, equipment, tools, disposal of all removed, materials, and <br />incidentals as required and no additional compensation will be allowed therefore, <br />IofI <br />