My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NAKA ENGINEERING AND CONSTRUCTION, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
NAKA ENGINEERING AND CONSTRUCTION, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2016 1:22:27 PM
Creation date
9/29/2016 1:20:04 PM
Metadata
Fields
Template:
Contracts
Company Name
Naka Engineering & Construction Inc.
Contract #
16-2651
Agency
Public Works
Council Approval Date
8/16/2016
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA Addendum Three 6/29/16 <br />PROPOSAL <br />PROJECT NO.; 16-2651 <br />CIVIC CENTER RE -CAULKING EXPANSION JOINTS AT PLAZA OF THE FOUNTAINS <br />AND PLAZA OF THE FLAGS <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Sikaflex 2C SL Joint Sealant (Limestone <br />color) & Backer Rod <br />10,900 <br />LF <br />Y <br />$$ <br />� .37 <br />36,733. <br />2 <br />Sikaflex Primer 429 <br />10,900 <br />IF <br />$ ?J <br />$ L51) <br />3 <br />Temporary Construction Sign <br />6 <br />EA <br />$ <br />$ <br />4 <br />PCC Plaza Repair (4"W 7")* <br />1,000 <br />SF <br />$ <br />I o <br />/ o <br />0 0 a <br />5 <br />Unclassified Excavation* <br />30 <br />CY <br />$ S® <br />O <br />$ 100 e <br />TOTAL BASE BID <br />$ 61 837 00 <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />t This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within number (30) working days after the commencement date stated in the <br />Notice to Proceed. - - <br />The liquidated damages amount, in lieu of the XMount specified i Subsection 6-9 of the <br />Standard Specifications, shall be $300 minimum p r calendar day. <br />Name of Finn y) i _ `- <br />Signature of BIDDER <br />Title / re'5; e4f <br />(If an individual, so state, If a firm or co -partnership, state the firm name and give the names of <br />all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />P-2 ofP-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.