My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
22A - SPEC - HVAC CHILLER AND WATER PUMP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
10/04/2016
>
22A - SPEC - HVAC CHILLER AND WATER PUMP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2016 3:11:28 PM
Creation date
9/29/2016 1:54:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
22A
Date
10/4/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
After your project is completely installed, operational, and meets all requirements of the Program, which is <br />described in detail in the Customized Statewide Procedures Manual for Business and at <br />www.sce.com/customized—solutions: <br />• Complete, sign and submit the enclosed 2013 -14 Customized Solutions Installation Report. <br />• Submit final invoices and/or documentation to support project cost, clearly detailing all costs <br />associated with the project (equipment, labor, tax, etc.). <br />• Submit complete engineering calculations to demonstrate energy savings and documentation, if <br />applicable (including archival diskette, CD, etc.). <br />• Submit schematic drawings and /or manufacturer specification sheets, if applicable. <br />• Operating Report, if measurement and verification is required. <br />• Submit Pump Curve (if applicable) <br />NOTE: As a reminder, the deadline for the project to be completely installed and operational is one year from the date of this Project <br />Approval letter. Please submit the completed Installation Report within 30 days after installation and prior to the one year deadline. <br />Upon SCE review and approval of your completed hzstallation Report and supporting cost documentation, you <br />will be notified in writing. Thereafter, SCE will process the incentive check or SCE utility bill credit, as <br />applicable. If SCE is unable to approve your incentives based on the information provided, SCE may require you <br />to submit other documents related to the Project, Project site, solutions, energy savings, or any other documents it <br />requires, in its sole discretion, to make a decision on your Application. <br />If you have any questions, please contact your SCE Account Representative. You may also call us at (800) 736- <br />4777 Monday through Friday, from 8:00 a.m. to 5:00 p.m., or send an e -mail to 13usinessliieentives@sce.com. <br />Please have your project number available for reference when you call and include it in any e -mail <br />correspondence. <br />Business Incentives Team <br />Southern California Edison <br />Checkout www.sce.coml To see if ou qua I fyfor the Comprehensive Bonus. <br />2jA -6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.