Laserfiche WebLink
Energy Management Solutions Incentives <br />Application for Business Customers <br />2013 - 2014 Customized Installation Resort <br />DIRECTIONS: After your project is installed and operational, input the project installation commencement and completion dates in the fields <br />provided. Review the information from your Application Approval Letter. If nothing has changed, and the information in Sections 5 and 6 is <br />correct, complete and sign Section 7 on page 2 of this Installation Report (IR) Form and submit both pages to SCE at one of the addresses below. If <br />Business incentives Fo,overniq F_tdeNvew_ Fax: 626-633-3243 <br />Southern California Edison 6010 N. Irvvindaie Ave. E- mail: 3usinessInrenijves @sce. com <br />P.O. Box 800 Irwindale. CA 91702 C,ue,tions? Call 300- 736 ,777 <br />Rosemead, CA 91770 -0800 <br />UPN #: 353 -15- 0500765634 SAM 3- 000 - 8761 -23 Project Name: Santa Ana Library LT & MC <br />Customer Name: City of Santa Ana Customer's Authorized Agent: The Energy Coalition <br />Installation Commencement Date: Installation Completion Date: <br />Line # Solution Code Solution Description Description of Existing Equipment <br />1 LT -17492 Interior LED fixture replacement(utilizing approved <br />Il lminariael <br />2 LT -90853 Day lighting controls <br />3 <br />4 <br />5 <br />Note: If submitting more than 5 Solutions complete and attach the Customized Solution page from the Multiple Site/Solution Worksheet at w scexomfsolutions. <br />' <br />On -Peak <br />Energy <br />savings <br />Total Project Cost is) <br />$168,413.64 <br />Calculated <br />Solution # <br />Baseline <br />Usage (kWh) <br />Installed <br />Usage (kWh) <br />Energy <br />Savings (kWh) <br />Incentive <br />Rate ($IkWh) <br />Energy <br />Incentive ($) <br />1 <br />208,664.2 <br />29.10 <br />135,684.0 <br />$ 02 <br />$ 10,854.72 <br />Calculated Energy Savings Totals <br />139,939.0 <br />2 <br />17,018.0 <br />12,7630 <br />4,255.0 <br />$ 0.08 <br />$ 340.40 <br />3 <br />— <br />-- <br />Calculated Savings Incentives <br />'Inslwks Pmlesf Gm Atllushenl tll AppllsaMi <br />33,589,69 <br />4 <br />5 <br />$ - <br />5 <br />' <br />On -Peak <br />Demand. Reduction <br />On -Peak Demand Reduction (kW) <br />19.46 <br />Calculated <br />Solution <br /># from above <br />Baseline <br />On -Peak <br />Demand (KW) <br />Installed <br />On -Peak <br />Demand (KW) <br />On -Peak <br />Demand <br />Reduction (KW) <br />"- Peak Demand <br />Reduction <br />Incentive ($) <br />SA# 3- 000 - 8761 -23 <br />UPN # 353 -15- 0500765634 <br />NOTE: For projects requiring Ml attach any required <br />baseline or post - installation measurements and analysis, as <br />specified in your approved MV plan. <br />1 <br />29.10 <br />10.18 <br />18.92 <br />$ 2,838,00 <br />2 <br />2.16 <br />1.62 <br />0.54 <br />$ 81.00 <br />3 <br />$ <br />4 <br />$ <br />5 <br />$ - <br />Line# Solution Code Solution Description Description of Existing Equipment <br />1 <br />2 <br />3 <br />4 <br />5 <br />Note: If submitting more than 5 Solutions complete and attach the Customized Solution page of the Multiple Site/Solution Worksheet at w sceeomisolutions. <br />2ZA 8 <br />