My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - SAFE ROUTE KING ELEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
10/18/2016
>
23A - PROJ - SAFE ROUTE KING ELEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 2:52:28 PM
Creation date
10/13/2016 2:48:59 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
10/18/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 16-6871 <br />SAFE, ROUTESTO SCHOOL ENHACEMENTS FOR KING ELEMENTARY <br />STATE PROJECT NO: ATPl, 5063(160) <br />BID PROPOSAL <br />TO: CI'T'Y COUNCIL, OF THE CITY OF SANTA ANA <br />FROM: California Professional Engineering, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lunnp sum(s) set forth in the <br />following schedule: <br />Item <br />Description -- — <br />Qty — <br />Unit <br />Unit Price <br />Amount <br />I <br />"I'raflic Signal Installation at Me idden <br />Ave and Pacific Ave <br />I <br />LS <br />$ <br />I0J a,-/ 11 <br />---2 <br />—G—TT Opticom Emergency Vehicle <br />i <br />LS <br />$ <br />-7 <br />$ _ <br />preemption System <br />(Ur'`( <br />3 <br />Install 2" PVC Conduit Per Plsut 't <br />1 10 <br />LF <br />$� <br />$ <br />4 <br />Install3" PVCConduit[lei Plan <br />1295 <br />LF <br />$ <br />$ <br />L000 <br />5 <br />Install 4" PVC Conduit Per Plan ° <br />375 <br />LF $ <br />$ <br />—6 <br />Install Na 6 Pull fox ..__ <br />13 <br />EA <br />$ `� <br />$ <br />7 <br />4nstall No. 6E Pull Box ` <br />I <br />EA <br />$-7uo <br />li <br />8 <br />Install Traffic Signal Loop Detector (Type <br />E 10013)- <br />14 <br />EA <br />$ <br />9 <br />Install Bicycle Loop Detector (Type D <br />CircularLoop) <br />6 <br />EA <br />$ ,! <br />$ <br />10 <br />24 Strand SV PO Cable <br />950 <br />LF <br />$ <br />$ �r <br />11 <br />48 Strand SM]"O Cable <br />100 <br />LF <br />$ 11. C{ <br />C/o <br />$ <br />12 <br />Fusion Splice 1 Strand SMFO <br />96 <br />EA <br />$ <br />$3 <br />13 <br />FiberOptic Cable Splice Enclosure <br />1 <br />EA <br />$ <br />$ QCo <br />P -I ofP-17 <br />23A-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.