My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - SAFE ROUTE KING ELEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
10/18/2016
>
23A - PROJ - SAFE ROUTE KING ELEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 2:52:28 PM
Creation date
10/13/2016 2:48:59 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
10/18/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Status: Completed <br />Approximate Start/End Dates; Nov 2013 -Jan 2014 <br />Description of Supplies, Equipment, or Services Provided: Modify Traffic Signal at <br />One intersection along with Traffic Control, LED illuminated Street Name <br />Signs, install New Cabinet, Safety Lighting, Loops, Vehicle Pre-emption <br />System, Sidewalk Access Ramps & Traffic Signal Heads. <br />WoodruffJWashburn Traffic Signal <br />Amount: $156,697.58 <br />Owner: City of Downey <br />Owner Address: 11111 Brookshire Ave Downey, CA 90241 <br />Project Manager: Keith Hoey <br />Contact Phone #: (562) 622-5898 <br />Fax #:(562)904-7296 <br />Status: Completed <br />Approximate Start/End Dates: Apr 2013 -Aug 2013 <br />Description of Supplies, Equipment, or Services Provided: Upgrading Traffic Signal <br />at Intersection, Trenching, Conduit Runs, and Installation of LED Safety <br />Lighting. <br />Traffic Signal Modification at Broolchurst <br />Amount: $237,213.67 <br />Owner: City of Huntington Beach <br />Owner Address: 2000 Main Street Huntington Beach, CA 92648 <br />Project Manager: John Griffin <br />Contact Phone #: (714)375-5011 <br />Fax M (714)374-1648 <br />Status: Completed <br />Approximate Start/End Dates: March 2011 -Sept 2011 <br />Description of Supplies, Equipment, or Services Provided: Modify Traffic Signal at <br />Multiple Intersections along with Traffic Control, Installation of Curb Ramps & <br />Traffic Signal Heads, and Monument Preservations. <br />Traffic Signal System Upgrade Phase V -VIII <br />Amount: $292,175.99 <br />Owner: City of Santa Ana <br />Owner Address: 20 Civic Center Plaza Santa Ana, CA 92701 <br />Project Manager: William Albright <br />Contact Phone M (714) 647-5029 <br />Fax #: (714) 647-5622 <br />Status: Completed <br />Approximate Start/End Dates: Jan 2011 -Aug 2011 <br />Description of Supplies, Equipment, or Services Provided: Installation of Conduit, <br />Pullboxes, Traffic Signal, Interconnect Cable, Communication Equipment, <br />Page 3 of 4 <br />Document Last Updated 41520/6 <br />23A-31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.