My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - SAFE ROUTES MONTE VISTA ELEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
10/18/2016
>
23B - PROJ - SAFE ROUTES MONTE VISTA ELEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 2:55:13 PM
Creation date
10/13/2016 2:49:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
10/18/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA EXHIBIT 2 <br />PROPOSAL <br />PROJECT NO.: 16-6$73 <br />SAFE ROUTES TO SCHOOL ENHACEMENTS FOR MONTE VISTA ELEMENTARY <br />STATE PROJECT NO: ATPL- 5063(163) <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: KDC Inc., dba Dynalectric <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Traffic Signal Modification at McFadden <br />1 <br />LS <br />$ <br />$ <br />Ave and Raitt Street <br />7. 7C/,S" <br />{%3r `7%%_ <br />2 <br />GTT Opticom Emergency Vehicle <br />1 <br />LS <br />$ C3 4 r- <br />'1`1 <br />$ ✓ e,7 l GZ _. <br />�J� ` <br />Preemption System <br />3 <br />Install 2" PVC Conduit Per Plan* <br />1.00 <br />LF <br />$ ,. <br />$ �..,. <br />4 <br />Install 3" PVC Conduit Per Plan * <br />2075 <br />LF <br />$ <br />2� <br />$J/S <br />5 <br />Install 4" PVC Conduit Per Plan,* <br />400 <br />LF <br />$ 7 <br />$, <br />6 <br />Install No. 6' Pull Box* <br />13 <br />EA <br />$,� <br />! <br />$ i,' e177-- <br />7 <br />Install Traffic Signal Loop Detector (Type <br />E Loop) <br />21 <br />EA <br />$ <br />f <nGn <br />$ <br />j <br />8 <br />Install Bicycle Loop Detector (Type D <br />12 <br />EA <br />$ <br />3 z.2 <br />$ <br />31 oe <br />Circular Loop) <br />9 <br />24 Strand SMFO Cable <br />3800 <br />LF <br />$ ^-� <br />t: ..�31 <br />$ <br />01770 ... <br />10 <br />Fusion Splice 1 Strand SMFO <br />96 <br />EA <br />$ <br />1-7 <br />$ <br />/, 750 <br />11 <br />IP Communication System <br />1 <br />_ <br />LS <br />$ <br />$ �1 c_._— <br />c�C® <br />12 <br />Signing and Striping <br />1 <br />LS <br />$ <br />c/Z6r/' <br />$ <br />� 2Cr✓y' <br />13 <br />Construct 4" PCC Sidewalk <br />1,740 <br />SP <br />$ <br />�/'• �' <br />$ <br />/Qac 35�, _' <br />P-1 of P-17 <br />2313-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.