Contractor: Amec Foster Wheeler
<br />Tabletop Exercises (TTX} are intended to generate discussion of various
<br />DescriptionVaria(rtes
<br />issues regarding a hypothetical simulated emergency. They can be used
<br />to enhance general awareness, validate plans and procedures, rehearse
<br />concepts, and/or assess the types of systems needed to guide the
<br />participants (.4),
<br />prevention of, protection from, mitigation of, response to, end recovery
<br />Facilitation, Hours,
<br />participants (11),
<br />from a defined incident. The effectiveness of a TTX is derived from the
<br />Materials, location,
<br />$25,C08 - $50,000
<br />energetic involvement of participants and their assessmert of
<br />Reporting; pians
<br />recommended revisions to current policies, procedures, and pians;
<br />Materials,
<br />therefore facilitation is critical to keeping participants focused an
<br />procedures, or practice and maintain current skills. For every drilf,
<br />site/Mgt-
<br />exercise objectives.
<br />clearly defined plans, procedures, and protocols need to be in place.
<br />8) OperatiomBased Exercises - used to validate pions, policies, agreements, and procedures; clarify roles and responsibilities; and identify resource gaps.
<br />Exercises are cha acterized by actual reaction to an exercise scenario, such as Initiating communications or mobilizing personnel and resources. ("Nater
<br />Estimated costs are example costs only and depict a range that an exercise map fall within. Actual costs cog vary and is dependent on the size, scope, and
<br />variables Involved with a particular exercise)
<br />Exercise Type
<br />DescriptionVaria(rtes
<br />Range of Cost
<br />(Estimated)
<br />Preparation,
<br />Planning Meetings,
<br />A drill Is a coordinated, supervised activity usually employed to validate
<br />participants (11),
<br />a specific function or capability in a single agency or organization. Drills
<br />Facilitation, Hours,
<br />are commonly used to provide training on new equipment, validate
<br />Materials,
<br />Drill
<br />procedures, or practice and maintain current skills. For every drilf,
<br />site/Mgt-
<br />$30,000-$75,000
<br />clearly defined plans, procedures, and protocols need to be in place.
<br />Locations,
<br />Personnel need to be familiar with those pians and trained in the
<br />Reporting/pians,
<br />processes and procedures to be drilled.
<br />Travel & Expenses,
<br />Moulage, Muck,
<br />Volunteer
<br />Coordination
<br />Page 2 of 3
<br />
|