Laserfiche WebLink
Local Assistance Procedures Manual EXHIBIT 10-H <br />Sample Cost Proposal <br />EXHIBIT Ift-H SAMPLE COST PROPOSAL (EXAMPLE #3) <br />CST PER UNIT OF WORK CONTRACTS <br />(GLoTECNNICAL AND MATERIAL TESTING',) <br />Note: Mark-ups are Not Allowed <br />Consultant KPbF Contract No. Date 3/15/16 <br />Page 01 <br />Unit/Item of Work: <br />(Example: ,Log of Test Boring for Soils Report, or ADL Testing for hazardous Waste Material Study) <br />Include as many Items as necessary. <br />DIRECT LABOR Hours Hourly Total ($) <br />Billing <br />Rate ($) <br />Professional (Classification) _ $ 0.00 <br />Sub-professional,'Technieal* $0,00 <br />EQUIPMENT (with Operator) T $ 0.00 <br />OTHER DIRECT COST <br />Description Units) Unit Cost <br />Mobiliaation/De-iriobilization 4 $ 0.00 <br />Supplies/Consumables (Itemize) $ .__ . $ 0,00 <br />Travel/Mileage �— $- $ 0.00 <br />Report (if applicable) $ $ 0.00 <br />TOTAL COST PER UNIT OF WORK $ 0.00 <br />NOTES: <br />e Denote labor subject to prevailing wage with asterisk{*), <br />'i Iourly bilfng sates should include prevailing; wage rates and be consistent with publicly advertised rates charged to all clients, <br />(C oroniereiai, Private or Public). <br />• Hourly billing antes include hourly wage rate, net fee/profit, indirect cost rate, and actual direct equipment rate- <br />. Mot>ilizatioolDe-tnobilization is based on site location and number and frequency of testsfiters. <br />ODC stents should be based on actual costs and supported by historical data and other documentation. <br />ODC items that would be considered `tools of the trade" are not reimbursable. <br />Page 5 of'.4; <br />LPP IS -OI January 14, 2015 <br />