Laserfiche WebLink
COST ANALYSIS <br />CONSTRUCTION OF THE PROJECT NO. 16-2667: SANTIAGO BIKE TRAIL <br />RESURFACING <br />Construction Contract <br />$ <br />66,472.00 <br />Contract Administration <br />$ <br />3,147.00 <br />Inspection and Testing <br />$ <br />3,500.00 <br />Contingencies <br />$ <br />6,647.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />79,766.00 <br />EXHIBIT 4 <br />20B-47 <br />