My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20C - AA - DELHI CHANNEL PROJ
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
11/15/2016
>
20C - AA - DELHI CHANNEL PROJ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 3:50:12 PM
Creation date
11/10/2016 3:43:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20C
Date
11/15/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Canyon Regional Park, Mason Regional Park and, Irvine Coast Wilderness Park. Trail users <br />include walkers, joggers, runners, mountain bicyclists and equestrians. <br />14. Comment: Suggest labeling the "Back and Front of the Ninth hole" and the pedestrian <br />bridge on Figures 5 and 6 for anyone not familiar with golf terminology. <br />Response: Figures 5 and 6 have been revised to include labels for these features, and are <br />included as Attachment C of this Response to Comments document, The "Back Nine" is the <br />Newport Beach Golf Course's official name for the South East portion of the coarse which <br />contains the reservoir (lake). The "Front Nine" is the official name for the North West portion <br />of the course. The two halves are separated by the Santa Ana Delhi Charnel which has a <br />pedestrian bridge spanning the two halves of the fall course. <br />15. Comment: Page 2-17, first paragraph reference the public recreation trail. Please delete <br />all references to trails in the IS/MND. <br />Response: See Response to Comment 13. <br />16, Comment: As shown in Table 2.4-1 (page 2-18 of the IS/MND), please identify where the <br />13,380 sq. ft. permanent maintenance easement and 4,300 sq. ft. sewer easement will be <br />located (e.g. within the streets, JWA, or County property?). <br />Response: Basements will be within the Newport Beach Golf Course as shown in Figures 5 <br />and 6 (Attachment C). <br />17. Comment: Page 3-1, under item No. 5 Project Sponsor, please clarify here and <br />throughout the ISlMND that OCFCD is a Project Sponsor. <br />Response: Continent noted. It is acknowledged that OCFCD is a Project Sponsor along with <br />the Cities of Santa Ana, Newport Beach and Costa Mesa. Section 3.1 has been revised to list <br />OCFCD as a Project Sponsor and included in Attachment D of this Response to Comments <br />document. <br />18. Comment: It should be shown with analysis that the proposed in -channel diversion <br />facility and appurtenances will not affect the existing flood protection level provided by <br />the flood control facility. <br />Response: See Response to Comment 0. The project will not affect the existing flood <br />protection level provided by the flood control facility. <br />19. Comment: Please confirm the submerged depth of the pumps so that the IS/AIND and <br />the project plans are consistent. <br />Response: The pump station wet well has a bottom invert of 32 feet below grade. During <br />normal dry weather operation, sump pumps shall be submerged between 2 and 8 feet of water <br />depth during pump cycling. During wet weather operation, wet well water surface will be <br />equal to channel water surface. <br />20. Comment: Agreements between the OCFCD/County and project partners are required <br />in order to define the terms and conditions under with OCFCD/County will accept <br />modifications to the channel and/or accept/share right-of-way, maintenance <br />PKIIWOOFOO <br />
The URL can be used to link to this page
Your browser does not support the video tag.