Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL Exhibit A <br />PROJECT NO.: 15-6848 <br />BISHOP-PACIFIC-SHELTON BIKE BLVDS <br />Item <br />Description <br />Ql'y <br />Unit <br />Unit Price <br />Amount <br />31 <br />Construct Type `B°" Catch Basin (L=7') <br />EA <br />1 <br />$ <br />including Local Depression <br />W, .,.� <br />(0(000- <br />32 <br />Remove Interfering AC Pipe and Replace <br />LF <br />20 <br />$ <br />$ <br />with PVC Pipe complete ill Place <br />IP - <br />TOTAL BASE BID <br />$ 1('o <br />ADD ALTERNATIVE ONE <br />33 <br />Unclassified Excavation* <br />CY <br />75 <br />$ <br />$ <br />34 <br />Construct PCC Sidewalk ('r=4")* <br />SP <br />225 <br />$ <br />$ <br />(I ;' <br />D- -D le(%, <br />35 <br />Construct PCC Curb Ramp* <br />SF <br />960 <br />$ <br />$ <br />36 <br />Construct PCC Curb only (B -I )* <br />LF <br />265 <br />$ <br />$ <br />I0 0-70, <br />37 <br />Dccanposed Granite with Stabilizer* <br />SF <br />2,100 <br />$ <br />$ <br />38 <br />Finnish and Install Rock Boulder <br />LS <br />7 <br />$ <br />a- <br />39 <br />Landscaping <br />LS <br />1 <br />$ <br />$ <br />40 <br />60 Working Days Landscaping <br />LS <br />1 <br />$ <br />$ <br />Maintenance <br />i I <br />0(2 <br />TOTAL ADD ALTERNATIVE ONE <br />$ O )W O, ' <br />TOTAL BASE BID + ADD ALTERNATIVE ONE <br />$ 1 LJ -0 ( ,. <br />The lowest responsible bidder shall be selected based on the Total Base Bid. The City reserves <br />the right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the `°25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within 80 working days after the commencement date stated in the Notice to <br />Proceed. Contractor shall stagger the intersection improvement work to be in multiple phases. <br />P-3 of P-18 <br />23B-52 <br />