Laserfiche WebLink
COST ANALYSIS <br />CONSTRUCTION OF THE PROJECT NO. 15-6848: BISHOP-PACIFIC-SHELTON <br />BIKE BLVDS <br />Construction Contract <br />$ <br />876,111.00 <br />Contract Administration <br />$ <br />48,350.00 <br />Inspection and Testing <br />$ <br />83,067.00 <br />Contingencies <br />$ <br />87,612.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />1,095,140.00 <br />WNUM`i! <br />23B-55 <br />