Laserfiche WebLink
EXHIBIT A <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS 16-102 <br />FOR INSTALLATION OF FIRE SAFETY - SMOKE CORRIDORS AT CITY HALL <br />SCOPE OF SERVICES & SPECIFICATIONS <br />The City of Santa Ana City Hall building is a 9 -story structure inclusive of a basement; The doral <br />goal of the project is to Increase fire safety and enhance security by installing fire -rated doors <br />and other fixtures at City Hall smoke barrier corridors on Floors 3, 4, 6 and S. <br />Product specific references In this bid are for reference only and do not In any way obligate the <br />contractor use that brand name product. However, for equivalency comparison purposes, <br />bidding contractors are requested to state the brand name of any equivalent products being <br />proposed for use. <br />Either f the following current CSLB Contractor Licenses is requlred for award.ofi tris- niract: <br />• C28 — Lock and Security Equipment Contractor <br />® C61 / D28 — Doors, Gates and Activating Devices Contractor <br />desirable contractor traits:``' <br />r All Contractor workers for this project should have at least 10 years of work experience iii <br />fire=rated door assemblies and related closer, latch, and door gasketing requirem; nis` <br />References for a minimum of three (3) previous completed smoke corridor 3rolc,cts of <br />similar size in commercial facilities. <br />'Previous work in municipal environments is highly desirable. <br />k PF OF' WORK; <br />A. Cid Hall 3flo Floor Main Lobbv <br />Furnish and install <br />1�. Now 6/0 x 7/0 pair of solid core wood <br />2, Prefinished clear birch <br />3. 60-i-ninute fire -rated wood doors with hollow metal door frame and BB hinges `. <br />4. Von Duprin 99/27 panic devices less bottom rods, active to have electrified retraoti;an�', <br />wlth exterior lever, inactive to be exit only, <br />5• LCN 4040 XP FID surface closers, <br />6. Center astragal brush seals <br />Duprin power supply 914 with EI transfer hinge, complete with all mounting' <br />hardware, <br />FW-ning and drywall, mud and tape finish off of new door opening for new door <br />installation to replace existing double doors. <br />B. City Hall 4T" Floor Main Lobb! <br />Furnla' and install; <br />t. New 3/6 x 7/0 single solid core wood door, prefinished clear birch <br />2. 60 -minute fire -rated wood door with hollow metal door frame and BB hinges <br />RFP 16.102 Installation of Fire Safetv - Smoke Corridors at City Hall <br />25B-10 <br />