Laserfiche WebLink
CITY OF SANTA ANA <br />RFP i` O,;. 16-090 <br />NATER WELL, PUMP AND MOTOR REPAIR SERVICES <br />Appendix <br />ATTACHMENT" f SCOPE OF WORK <br />A. General Description <br />The Contractor shall provide water well casing, pump and motor rehabilltatlon, repair, replacementand related <br />services for the City of Santa Ana at various locations within the City. The general scope of services Is <br />described below:. <br />B. Work Description <br />The Contractor shall provide all necessary supervision, labor, materials, tools, and equipment to <br />perform pump pulling and installations, water well rehabilitations,, well casing repairs and installations, <br />water wait video Inspections,, electric motor repairs, electric motor rewlndfngs„ and repairseryloes <br />on various types of pumps and. motors, on an as assigned basis, at various locations throughout the <br />City. The Contractor shall meet with the Water Production project manager prior to: starting any :work. <br />at the worksite. Access to the worksite shall be controlled by the Public Works Agency according to <br />the sacurity standards in place at that time. The Contractor's services shall include, but are not <br />necessarily limited to„the foflowfng: <br />The Contractor shall provide transportation for its heavy duty equipment, such as, but not limited to, <br />drilling rig pump rig, flatbed truck, boom truck, tractor trailer, as requested by the City to and from <br />Contractor's facility to each Water Production worksite. All electric motor repair work shall be <br />transported by the Contractor to an EASA.. Accredited Member facility for repair and returned to the City <br />when repairs are complete. All water discharged shall be through an NPDES facility approved by the <br />Project Manager It shall be the Contractor's responsibility to propose a' method to .discharge water that is <br />NPDES compliant and may include methods such as water detenti;cn through storage tanks or other <br />conforming strategies. <br />1, PUMP RCMaVALIINSTALLATION SERVICE <br />The Contractor shall be qualified to perform water well pumps removal and instaliation. At the initial setup <br />for pulling a Wal pump, the Contractor shall perform lockoutitagout of the electrical and hydraulic systems: <br />2. WELL PERFORMANCE TESTING SERVICE <br />The Contractor shall be qualified to perform well performance testing. After initial well performance testing <br />setup, all testing data shall be given to the City representative upon completion of testing, The <br />Contractor shall furnish and install in e development engine temporarily used to power the test pump <br />process to flush, out all sand and small grit out of the area around the wall to prevent clogging of the <br />distribution system. All water discharged shall be through an approved facility approved by the Project <br />Manager. The Contractor shall provide the Project Manager with Its evaluation and recommendation, <br />Including cost estimates per project. All testing work shall be subject to the Project Manager's written <br />approval prior to commencing any work by the Contractor. Well performance testing' shall be done In <br />accordance with AWWA Al 00-97 standards. <br />3 WATERWORKS PUMP REPAIR SERVICE <br />The Contractor shall be qualified to repair of one or more of the following pump units; <br />25C-11 <br />