My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - WATER PUMP REHAB SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
11/15/2016
>
25C - AGMT - WATER PUMP REHAB SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 4:32:37 PM
Creation date
11/10/2016 4:28:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
11/15/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 16-090 <br />w2vrER WELL, PUMP AND 'tNIOTOR REPAIR SERVICES <br />1. Visually Inspect coils and windings for excessive wear, signs of conductor overheating or fatigue <br />that possibly would not be apparent during an electrical test. <br />2. All stators shall be surge- tested with an electronic surge tester specifically designed to apply a <br />surge voltage stress test simultaneously between turns of a coil, between phases, from winding to <br />ground and to detect short-circuited turns in winding under test. Testing shall be per EASAJEEE <br />612:2, 11.2 and 7.2.3 standards, Infrared imaging shall be provided pre and post test, <br />d.. Mechanical Fit <br />1. Measure the bearing bores, shells, housings and shaft journals using a micrometer. Shaft fits and <br />housing fits shall cornply with AR100-2015, Machine work shall be approved by the Engineer <br />before being performed or machine work may not be paid for,. Bearing journals, seal surfaces and <br />bearing housing restoration shall be done by metalizing and machining or boring and sleeving. <br />Documentation of before and after measurements shall be made. <br />2. Repiace bearings per manufacturer's specifications. All grease fittings, plugs, eta shall be replaced <br />unless otherwise indicated by the Engineer. Bearings shall be properly lubricated and bearing oil <br />reservoirs shall drained for shipping and installation. The Contractor shall be responsible for filling <br />the bearing oil reservoir upon installation. All equlpment shall be tagged with Information as to <br />whether or not bearing oil reservoirs were filled and what type of lubricant was used. <br />e. Rotor Balancing <br />1, All rotors of motors rated at 50 HP/3600/1800 RPM and above shall be dynamically balanced,, with <br />the rotor running at rated speed where practical, but not less than 6170 RPM In the balance stand. <br />The balancing speed shall also be rapid enough so the balance machine sensitivity can reliably <br />measure the maximum allowable residual unbalance. <br />2. A printout tape from the bafance(analyzer shall be furnished detailing the final balance values. This <br />tape will be attached to the reconditfon/repair/rewind documents when the motor is delivered. <br />f. Motor Leads <br />Motor leads shall be permanently tagged with non-magnetic markers, Motor lead configuration shall <br />not be altered. <br />g. Insulation <br />1, Windings shall, be double -dipped with Class H varnish and Naked. <br />2. Machine -finished surfaces bore of the stator lamination and periphery of, the rotor laminations shall <br />be cleaned of varnish and foreign materials. Photo documentation of this process shall be made <br />prior to and after lamination. <br />h. Final Test <br />1. A 1000 volt meg-ohm meter shall be used to verify insulation continuity, This reading shall be <br />documented. After reassembly, motor shaft be test -run at rated voltage and frequency. No load <br />voltage and phase currents shall be recorded. Vibration mils displacement shall be measured and <br />recorded in the horizontal, vertical and axial planes on both ends of the motor, or top and bottom of <br />vertical motors and documentation of current reading and vibration readings shall be provided to the <br />Engineer. <br />2. A 5KV meg-ohm meter shall be used to verify insulation continuity of all 41.60V motors. <br />i. Paint <br />1. Exterior of motor shall be properly cleaned of rust and foreign material, prime painted and finish <br />painted with a good grade of machinery enamel, the same color as received unless otherwise <br />specified. Nameplates, machined surfaces and internal parts shall be protected from paint. <br />25C-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.