Laserfiche WebLink
CITY OF SANTA ANA <br />RFP NO.: 16-090 <br />WATER WELL, PUMP AND MOTOR REPAIR SERVICES <br />terminals or lugs <br />1 <br />15 <br />Tellus 68 oil <br />LS <br />1 <br />15--- <br />15 <br />Rewinding of Electric Motor f <br />LS <br />1 <br />3000 <br />3,000 <br />Well Work <br />Mobilization &set-up __ <br />1 <br />0 0 <br />2 0 <br />Under Water video of well (before) <br />1 <br />1 <br />Wire brushing of well section underwater & <br />perforations <br />Ea. <br />1 <br />3 000 <br />3,000 <br />Chemical treatment during wire brushing (optional) 2 <br />LS <br />1 <br />120,000 <br />20,000 <br />Bail & dispose of all dirt & debris <br />Set <br />1 <br />2,000 <br />2,000 <br />SONAR Jet of perforations (420 feet, three intervals) 3 <br />LS <br />1 <br />5,000 <br />5 000 <br />Under Water video of well (after) <br />LS <br />1 <br />1,100 <br />00 <br />Demobilization &pick-up <br />LS <br />1 <br />Baa <br />_1M <br />Proposed new pump: Make: National Model No.: H14MC , GPM: 3,000 TDH: 165. <br />Eff.: <br />1. Motor refurbishing includes shop work, labor and material to perform the following: disassembling, <br />steam cleaning, Inspection, replace bearings, heaters, dipping (one thin layer, baking, reassembling, <br />testing) <br />2. Chemical treatment during wire brushing will not be used in the evaluation of the bids. if chemical <br />treatment is applied, the bid price must include cost of the chemicals, chemicals handling (application & <br />mixing), used chemicals neutralization and disposal <br />3. Sonar Jet must be performed by SONAR -Jet by Water Well redevelopers, Inc. (714) 632-7003 <br />4. Chemical treatment during wire brushing will not be used in the evaluation of the bids. If chemical <br />treatment is applied, the bid price must include cost of the chemicals, chemicals handling (application & <br />mixing), used chemicals neutralization and disposal <br />5. Pump base will be replaced, and attached to existing discharge pipe, if welding is needed, will be bill at <br />time and material <br />6. Concrete around the pump base will have to be removed and replaced. <br />7, New Stainless Steel line for sounding will be provided and installed, with necessary mounting brackets, <br />and one gauge calibrated for sounding. <br />8, Sound attenuation shall be required for major work. Sound attenuation for engine noise shall be limited <br />to a maximum of 75 d6(A) at 23 feet when operating at full rated load. Sound proofing solution to be <br />approved by the Engineer. <br />25C-22 <br />119 <br />