Laserfiche WebLink
L..ILWUJ,t_Y'1 <br />CITY Of'$ANTA ANA <br />RrP NO.r.1&090 <br />WATER WELL, PUNIP AND NIQTOR REPAIR SERVICES <br />AjSiMtoilfitX .r_........ ��_.___._.._..._ <br />ATTACHMENT 1, SCOPE OF WORK <br />A, General Uescrrptlon <br />Tho Contractor shall provide water well casing, pump and motar rahabiiHation; repair, replacement and related <br />services for the City of Santa Ana at various locatfons within the City. The general scope of services Is <br />described below„ <br />6. Work Description <br />The Contractor shall provide all necessary Supervision, labor, materials, tools, and equipment to <br />perform pump pulling and installations, water well rehabilitations„ wall casing repairs and installations, <br />water well video Inspections,, electric motor repairs, electric motor waw€rl irl.gs,Fand repair services <br />en various types of pumps and,motom, on an as assigned basis, at various locations throughout the <br />Clty. The Contraotor shall meet with the Watat Production project manager prior to starting any work <br />at the worksite, Access to the worksite shall be controlled by the Public Works Agency according to <br />the saaurlty standard; in place at that time, The Contraotcr's services shall Include, but are not <br />necessarily I€mitedto,thefbllowing: <br />The Contractor shall provide transportation for Its heavy duty equipment, such as, but not limited to, <br />drilling rig, pump rig, flatoed truck, boom truck, tractor trailer, as requested by th:e Ot'y to and from. <br />Contraetor''s facility to eaclh Water Production worksite, All electric motor repair work shall be <br />transported by the Contractor tis art, EASA Accreditod Member facility for repair and roturne.d to the City <br />when repairs ate complete All. water dtsohargW shall be through an NPI)ES'facility approved by the <br />Project Manager, It shall be the Contractpes: responsibility to propose a method to discharge water that is <br />f Pk7ES compliant and may €nclude melh:pds ,such as water d'etentioh through storage tanks. or other <br />conforming stratsgies. <br />1, PUMP R, MrCVALIJNSTALLATION SERVICE <br />The Contractor actor shall be qualified td gorforrn water well pumps removal and installation. Attha Initial setup <br />W pulling..,.a well pump,. the Contractor shall perform I'ockout/tagout of the electrical find hydraulic systems. <br />2, WELL PERRORMANGC TESTING SERVICE <br />The Contractor shall be qualified to perform wall perfbrMance testing. After initial well performanoe testing <br />setup, ail testing data shall be given to the. City representative upon completion of testing, The <br />Contractor shall fumish and Install t he development engine temporarily used to power the test pump <br />process to flush. out all send and small grit out of the area around the well to prevent clogging of the. <br />distribution systam> All water discharged shall be through an approved facility approved by the Project <br />Manager. The Contractor shall provide the Project M'anag'er with AS evaluation and recommendation, <br />Including cost estimates per project, AA testing work shall be subject to the Project Manager's written <br />approval prior to commencing any work by the Contractor. Wall performance tasttng.shall by done in <br />accordance with AWWA A100i97 standards. <br />3. WATERWORKS PUMP REPAIR SERVICE <br />The Contractor shall be qualified to repair of one or.more of the following pump units: <br />25C-33 <br />