My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - WATER PUMP REHAB SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
11/15/2016
>
25C - AGMT - WATER PUMP REHAB SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 4:32:37 PM
Creation date
11/10/2016 4:28:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
11/15/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.; 16.090 <br />WATER WELL, PUMP AND MO"T"OR REPAIR SERVICES <br />Mobilization & set-up <br />1 <br />1 250.00 <br />1,250.00 <br />(v } _�__-____ <br />Under Water video of well beforo <br />.I <br />` 1"M10 <br />1,100.00 <br />�" -- --- <br />Wire brushing of well section under water & <br />Ea; <br />�— <br />- <br />_1�1.20,.4d <br />perforations <br />Chemical treatment during wire brushing (opticnaq 2 <br />LS <br />1 <br />9,100.00 <br />.� 91100.00 <br />_ ._�_..M__ <br />Bail & dispose of all dirt & debris �_ <br />Sot <br />1 <br />_ 28 350.00 <br />2,350.00 <br />26 350.00 <br />2 350.00 <br />SONAR Jet of perforations X120,faei,,three inter_vais) 3 <br />( <br />L5 <br />1 <br />�_�'��'mu0000- <br />Under Water video of_weli (after) __ <br />LS <br />I� _ <br />6 ?_,40 00 <br />_6 340.00 <br />Demobilization & pick-up _� y -� <br />LS <br />1 _ <br />1.00100- <br />1,250,00 <br />1,250.00 <br />NO i E - ALL. rr<UNG NULUUtti AIJHLIC:ABLE SALES TAX. <br />Proposed new pump; Make: National PunModel No.: 1114MC , GPM: 3,000 TDH: 165 <br />Eft" 64.6°/a - ` NOTE; THIS DESIGN POINT WILL OPERATE IN SLIGHT OVERLOAD WITH 150HP MOTOR. <br />1. Motor refurbishing includes shop work, labor and material to perform the following: disassembling, <br />steam cleaning, inspection, replace bearings, heaters, dipping (one thin layer, baking, reassembling, <br />testing) <br />2. Chemical treatment during wire brushing will riot be used in the evaluation of the bids. If chemical <br />treatment Is applled, the bid price must include cost of the chemicals, chemicals handling (application & <br />mixing), used chemicals neutralization and disposal. <br />3. Sonar Jet must be performed by SONAR -Jet by Water Well redevelopers, Inc. (714) 632-7003 <br />4. Chemical treatment during wire brushing will not be used in the evaluation of the bids, .If chemical <br />treatment Is applied, the bid price must include cost of the chemicals, chemicals handling (application & <br />mixing), used chemicals neutralization and disposal. <br />5. Pump base will be replaced, and attached to existing discharge pipe, If welding is needed, will be bill at <br />time and material. <br />6. Concrete around the pump base will have to be removed and replaced. <br />7. New Stainless Steel line for sounding will be provided and installed, with necessary mounting brackets, <br />and one gauge calibrated for sounding. <br />6. Sound attenuation shall be required for major work. Sound attenuation for engine noise shall be limited <br />to a maximum of 75 dB(A) at 23 feet when operating at full rated load. Sound proofing solution to be <br />approved by the Engineer. <br />qS <br />25C-43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.