Laserfiche WebLink
C1t'TY OF SANTA ANA <br />RFP NO,: 16-090 <br />NATER WELL, PUMP AND MOTOR REPAIR SERVICES <br />o. insulation: Windings shall be double -dipped with Class H varnish and baked. Insulation shall be tester,/ <br />phase -to -phase and phase -to -ground at 1000 volts do and yield a one minute test result of 1000 mag - <br />ohms or better, <br />f. Final Test. A 1000 volt meg-chm meter shall be used to verify insulation continuity, This reading shall <br />be documented, After reassembly,_ motor shall be test -run, at full voltage and documentation of current <br />reading and vibration readings shall be provided to the end user. (NOTE: a 6KV meg.-ohm meter shall <br />be used on all 4160V motors.) Copper DC resistance tests,, phase -to -phase, on rotor winding from slip <br />rings shall be performed, If the rewound rotor fails to pass any test, the rotor shall be rejected. The <br />Contractor shall rebuild and retest until all tests are approved by the City, <br />8. PUMP RECONDITIONING <br />a. Disassemble and otearn. <br />b. Replace seals and ball bearings per EASA Standards. Vendor shall use only manufacturer - <br />recommended ball bearings and mechanical seals. <br />a Change oil, <br />d. Test windings and rewind as necessary. <br />e. Reassemble and test. <br />f. Document and photograph all conditions before and after disassembly, seal and ball bearing <br />replacements and final testing, <br />9. MACHINE WORK <br />Machine work shall apply to, but not be limited to, the drilling and tapping of broken bolts, the repairing of <br />damaged locking rings and stators, the replacing of power cords, power cord assemblies and power cord <br />connectors and repairs to impellers, covers, volutes, mounting rails, bearing journals, and pump shafts, <br />1'0.O.UALIFI'CATIO NS' <br />a. All electric motor repair shops shall be EASA Accredited and shall provide a copy of the certification <br />upon request by the City. Failure to provide a sub -contractor that is an EASA Accredited Member <br />as a part of the proposal may be,grounds for proposal rejection. <br />b.. Contractor or Contractor s. subcantrac[or shall be certified as an UL Facility and shall provide a copy of <br />the certification upon request by the City., <br />c. Contractor shall be responsible for obtaining all O.E.M. technical documents, drawings and parts when <br />necessary. <br />d, Contractor shall have all engineering, design, metalizing, welding, heat treating, machining, balancing, <br />calibrating and testing capabilities necessary to completely refurbishirewind electric motors. <br />e, Equipment used for inspecting, calibrating and testing pumps and motors shall be up-to-date and have <br />calibration certificates, less than on -e year old, traceable to NEST standards where applicable. <br />11, DOCUMENTATION <br />All work performed to recondition, repair and/or rewind motors shall be supplemented with reports that <br />verify all, processes to accomplish each job order. Documentation shall include, but is not limited to, the <br />following: <br />a. Pro -Disassembly Testing report for all activities as described. <br />b. Photo documentation of existing condition prior to fulfilling each described criteria of the disassembly <br />test, <br />G. Motor Disassembly report., including photo documentation before and after cleaning. <br />25C-58 <br />