My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MATRIX ENVIRONMENTAL, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
MATRIX ENVIRONMENTAL, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:20:35 PM
Creation date
11/29/2016 4:17:39 PM
Metadata
Fields
Template:
Contracts
Company Name
MATRIX ENVIRONMENTAL, INC.
Contract #
16-6876
Agency
Public Works
Council Approval Date
8/16/2016
Destruction Year
2021
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />Exhibit B <br />DATE & TIME OPENED: 7/28/2016; 2:00:59 PM <br />PROJECT NO 16.6876• FORMER YMCA - MATERIALS ABATEMENT AND ENVIRONMENTAL REMEDIATION <br />BIDDER <br />1 Interior wall base <br />Base cove mastic <br />Matrix Environmental, Inc. <br />CITY <br />$ 6.00 <br />$ 1 200.00 <br />Long Beach <br />9 <br />BID BOND <br />Rolled roofing fields, fops and <br />SF <br />Yes <br />6,000.00 <br />$ 32,50 <br />$ 195,00400 <br />UNIT <br />T'UTAL <br />k EID ITEMS Description <br />UNIT <br />QTY <br />COST <br />COST <br />1 Mobltlmdon/Demobilization (no mora than 10%) <br />LS <br />$ 1.00 <br />$ 120,000.00 <br />120,000.00 <br />2 Permits <br />LS <br />$ 1.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />3 Windows Panes <br />LS <br />$ 1.00 <br />$ 38,000.00 <br />$ 38,000.00 <br />4 Board Up Windows <br />EA <br />$ 30.00 <br />$ 413.33 <br />$ 12,399.90 <br />5 Pool Water Analysis, Removal and Disposal and <br />LS <br />$ 1.00 <br />$ 7,500,00 <br />$ 7,500.00 <br />Bottom Clean Up <br />Gaskets <br />SF <br />$ <br />3.00 <br />6 Drain Cleaning <br />LS <br />$ 1.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />7 Polyethylene Sheathing Around Scaffolding <br />L9 <br />$ 1.00 <br />$ 25,000.00 <br />$ 25,000.00 <br />8 Building Security <br />LS <br />$ 1.00 <br />$ 50,00.00 <br />$ 50,000.00 <br />22 <br />1 Interior wall base <br />Base cove mastic <br />LP <br />$ isuo <br />$ 6.00 <br />$ 1 200.00 <br />23 <br />9 <br />Roof (includes all leverls with asphalt sheeting) <br />Rolled roofing fields, fops and <br />SF <br />$ <br />6,000.00 <br />$ 32,50 <br />$ 195,00400 <br />associated mastics <br />l0 <br />Basement throughout Walls <br />Mirror Mastic <br />SF <br />$ <br />150.00 <br />$ 8,67 <br />$ 1,300.50 <br />11 <br />Basement floor at youth shower across to pool and <br />Blue ceramic tile and <br />SF <br />$ <br />75.00 <br />$ 14.00 <br />$ 1,050.00 <br />youth restroom <br />mortar grout <br />12 <br />Basement at boiler mom piping and at tat floor <br />Gaskets <br />SF <br />$ <br />3.00 <br />$ 500.00 <br />$ 1,500.00 <br />storage at abandoned water heater <br />13 <br />Basement tat floor throughout <br />Plaster walls and ceilings <br />SF <br />$ <br />24,000.00 <br />$ 325 <br />$ 78,00,00 <br />14 <br />1 at floor storage between gym and Xerox roam at <br />Heater gasket <br />SP <br />$ <br />5,00 <br />$ 150.00 <br />$ 750.00 <br />abandoned heater unit <br />l5 <br />tat floor closet at staff area <br />12"x12"White VFT and <br />SP <br />$ <br />12.00 <br />$ 50.83 <br />$ 609.96 <br />mastic <br />16 <br />let floor/basement Gymnasium south and east <br />Non - slip floor covering/smir <br />stairs to basement <br />tread and an, mastic <br />SP <br />$ <br />14000 <br />$ 11.00 <br />$ 1,540.00 <br />17 <br />lstdoor office east of gymnasium (near staircase) <br />Ceramic the grout and mortar <br />SF <br />$ <br />60.00 <br />$ 1200, <br />$ 720.00 <br />18 <br />1 at floor kitchen on west wall <br />Paper HVAC boat wrap <br />LF <br />$ <br />5.00 <br />$ 100.00 <br />$ 500.00 <br />19 <br />lstfloor kitchen on west wall from basement level <br />Cementitous vent pipes <br />ceiling through roof, and sterageroo n ceiling <br />SP <br />$ <br />80.00 <br />$ 6.56 <br />$ 524.80 <br />20 <br />2nd floor roam 227 <br />Baseboard and mastic <br />LF <br />$ <br />45.00 <br />$ 2.22 <br />$ 99.90 <br />21 <br />Southeast interior stairwell at 21rd/3rd flight, and <br />White plaster Type dollop <br />on abandoned gymnasium at room 201 <br />adhesive <br />SF <br />$ <br />20.00 <br />$ 12.00 <br />$ 240.00 <br />Southwest Building <br />22 <br />1 Interior wall base <br />Base cove mastic <br />LP <br />$ isuo <br />$ 6.00 <br />$ 1 200.00 <br />23 <br />1 Roof Patches, seams and penetration <br />Silver paint and roof maskio <br />SF <br />$ 45,00 <br />$ 15.56 <br />$ 700,20 <br />Turd Items 9 -24 <br />Cenel'one Diad: <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.