Laserfiche WebLink
CITY OF SANTA ANA <br />PROJECT NO 16-6876• FORMER YMCA • MATERIALS ABATEMENT AND ENVIRONMENTAL REMEDIATION <br />M WIRD <br />BIDDER <br />Matrix Environmental, Ino, <br />55 <br />Exterior and Interior throughout <br />Window glazing putt <br />EA <br />$ 300,00 <br />$ 410.27 <br />$ 123,081.00 <br />56 <br />Besmnent at southwest stairwell at bottom londlug <br />Fibrous paper (insulation) <br />SF <br />$ 10.00 <br />$ 35.80 <br />$ 358.00 <br />debris <br />57 <br />Basment youth locker at north storage stair area <br />Green floor the and black <br />SF <br />$ 5.00 <br />$ 14.00 <br />$ 70.00 <br />mastic ( debris) <br />58 <br />Basement walls and ceilings, flooring piles <br />Drywall and joint compound <br />SF <br />$ 5,600.00 <br />$ 2.75 <br />$ 15,400.00 <br />(and debris) <br />59 <br />Basement at pipe chase closet (men's locker east of <br />Corrugated insulation <br />sauna), pipe chase east of men's shower <br />SF <br />$ 15.00 <br />$ 55.13 <br />$ 826.95 <br />(northeast of sauna) <br />60 <br />Throughout the basement and first our locations <br />Miscellaneous debris on <br />LS <br />$ 1,00 <br />$ 50,000.00 <br />$ 50,000.00 <br />ground and surfaces <br />61 <br />let floor southeast conference and office area( and <br />Drywall with joint compound <br />acticity center east lobby), nutrition and kitchen <br />walls and ceilings <br />SF <br />$ 2,000.00 <br />$ 2.75 <br />$ 5,500.00 <br />build out <br />62 <br />1st floor central area build out (nutrition, kitchen, <br />Plaster (button board - <br />SF <br />$ 3,000.00 <br />$ 2,75 <br />$ 8,250.00 <br />storages, office and Xerox areas) <br />plaster/drywall) walls <br />63 <br />tat floor at gymnasium floor <br />Corrugated paper insulation <br />SF <br />$ 100.00 <br />$ 25.00 <br />$ 2,500.00 <br />debris <br />64 <br />1st floor gymnasium at upper cat walk/running <br />Nan- slip floor coating on <br />5F <br />.$ 1,500.00 <br />$ 2.OD <br />$ 3,000.00 <br />balcony <br />woad floor <br />65 <br />1st floor acticity and nutrition room, mixed with <br />Pipe insulation debris on <br />burned, moldy fallen ceiling materials <br />ground and above piping <br />LS <br />$ 1,00 <br />$ 697.00 <br />$ 697.00 <br />66 <br />2nd and 3rd floor west stair landings <br />9 - inch grey floor tile and <br />SF <br />$ 50A0 <br />$ 12.00 <br />$ 600.00 <br />mastic <br />67 <br />2nd floor west stair landing wall build -out (debris <br />Drywall with joint compound <br />in stairwell closet) <br />walls and ceilings <br />SF <br />$ 340,00 <br />W 2.75 <br />$ 935.00 <br />68 <br />2nd floor restroom ceiling (debris at ceiling deck <br />Corrugated paper insulation <br />SF <br />It 40.00 <br />$ 43.16 <br />.$ 1,726.40 <br />and men's and women's shower at <br />debris <br />69 <br />2nd and 3rd floor ceiling adjacent to restroom and <br />TSI pipe <br />pipe chase; throughout north central roof area <br />(2n0rd level roof), north roof and wall area (north <br />LF <br />$ -650.00 <br />$ 21.26 <br />$ 3,189.00 <br />side of gym at 2nd and ground level). Debris <br />observed below damaged elbow areas <br />70 <br />2nd and 3rd floor ceiling adjacent to restroom and <br />Pipe elbows Insulation (and <br />pipe chase; throughout north central roof area <br />debris) <br />(2nd/3rd level roof), north roof and wall area (north <br />RA <br />$ 40.00 <br />$ 26.85 <br />$ ],154,00 <br />side of gym at 2nd and ground level), Debris <br />observed below damaged elbowareas <br />71 <br />3rd floor men's and women's restroom walls, 3rd <br />Drywall withjoint compound <br />floor storage closet ceiling <br />(including debris) <br />SF <br />$ 340.00 <br />$ 2.75 <br />$ 935.00 <br />5mrthe-"I Building <br />72 <br />Nonheasl room on our <br />Corrugated insulation debris ST <br />$ 3,00 <br />$ 16,67 <br />$ 50.01 <br />73 <br />Csillug/Floor <br />Cementitious piping SF <br />$ 3,00 <br />$ 16.671 <br />$ 50.01 <br />It -n! 5543: ti21N.32237 <br />Page 3 of 3 <br />