Laserfiche WebLink
CITE' Of ,SANTA ANS <br />PROPOSAL Exhibit 2 <br />PROJECT NO.: 16-6876 <br />FORMER YMCA — MATERIALS ABATEMENT AND ENVIRONMENTAL <br />REMEDIATION <br />BID PROPOSAL <br />TO; CITY COUNCIL OF THE CITY OF SANTA ANA <br />/ADDENDUM THREE <br />FROM; <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if airy) and the specifications for the unit prioe(s) or lump sum(s) set forth in the <br />following schedule: <br />*Submit a work plan for City approval phasing, and length of time, <br />Table A: Miscellaneous <br />Item <br />Description <br />Quantity <br />Unit <br />Unit <br />Price <br />Amount <br />1 <br />Mobilization/Damobilization <br />No more than 10% of the total bid Tables A -H <br />I <br />LS <br />W0,0CC, <br />$ <br />2 <br />Pormits <br />1 <br />LS <br />$ `� F" i?. <br />3 $ °L.� , <br />3 <br />Windows Panes <br />1 <br />LS <br />$38 one, <br />Basement throughout walls <br />4 <br />Board Up Windows <br />30 <br />EA <br />$A)_''v, ' <br />$—V <br />5 <br />Pool Water Analysis, Removal and Disposal and <br />Bottom Cleanup <br />1 <br />LS <br />$_�� <br />6 <br />Drain Cleaning <br />I <br />LS <br />$C)l, <br />7 <br />Polyethylene Sheathing Around Scaffolding' <br />1 <br />LS <br />$ f OcI iR021;2. <br />Pr <br />8 <br />Building Security <br />1 <br />LS <br />sg - <br />Totral Items 1=8: <br />mm $- jfai-�t�, <br />Ck.? <br />Table B: Asbestos Abatement <br />btem <br />^Location <br />Description <br />Quantity <br />unit <br />Unit <br />]Price <br />Amount <br />M aln Bn'ilding <br />0 <br />Roof (iaohrdos all levels <br />with asphalt sheeting) <br />Rolled roof ig fields, <br />felts and assoohdod <br />6000 <br />SF <br />$ ;2,:50 <br />s j,�W <br />mastics <br />10 <br />Basement throughout walls <br />Mirror Mastic <br />150 <br />SF <br />11 <br />Basement floor at youth <br />to <br />Blue ceramic tile and <br />S1a <br />$_�� <br />^ $ja <br />shower access pool and. <br />mortar/grout <br />75 <br />youth restroom <br />12 <br />Basement atboiler room , <br />Gaslrots <br />piping and at la` floor <br />storage at abandoned water <br />heater <br />P-1 of P-20 <br />9)� <br />