My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MATRIX ENVIRONMENTAL, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
MATRIX ENVIRONMENTAL, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:20:35 PM
Creation date
11/29/2016 4:17:39 PM
Metadata
Fields
Template:
Contracts
Company Name
MATRIX ENVIRONMENTAL, INC.
Contract #
16-6876
Agency
Public Works
Council Approval Date
8/16/2016
Destruction Year
2021
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 16.6876 Exhibit A <br />FORMER YMCA - MATERIALS ABATEMENT AND ENVIRONMENTAL <br />1RRMRnTATT0V <br />Table V, Clean.Tt of Aniroal and Human Waste <br />lien <br />Lee ion <br />Quantity <br />Unit <br />Unit Price <br />.sj6 <br />Amount <br />54 <br />Throughout tbo Building as <br />ars ooifioatbn <br />1 <br />Xn <br />%� <br />Bxtedor and intariot' <br />Total Item 54: <br />$ <br />WLJ <br />Table G: Asbestos Containing Materials (Procedure 5 Plan) <br />Item <br />Location <br />Description <br />QuantityUnit <br />Thaft <br />Price <br />Amount <br />Main BaiLdln <br />55 <br />Bxtedor and intariot' <br />Window glazing putty <br />300+ <br />BA <br />$ <br />throe rout <br />56 <br />Basomont; at southwest <br />stairwell at bottom <br />Fibfous paper (insulatiorn) <br />debris <br />10 <br />SF <br />$is <br />,�•� <br />landing <br />f <br />57 <br />BasemrnYt youth locker <br />at north storage stair <br />dteen floor tilt and blaok <br />mastic (dobris) <br />5 <br />SF <br />$ <br />area <br />58 <br />Basement walls and <br />Drywall and jointaompound <br />g600 <br />_ <br />VSF <br />$_C ��$� <br />oeilings, flooring flee <br />(and debris <br />59 <br />Basement at pipe chase <br />Corrugated insulation <br />closet (man's locker.. <br />Cast of scans), pipe <br />15 <br />SF <br />$ < <br />$ <br />phase east o£rnen's— <br />M <br />showw (7norowast of <br />µ <br />san'na) <br />60 <br />Tiu:oughout the <br />Miscellaneous debris on <br />basement and first <br />ground and surfaoos <br />1 <br />LS <br />$ x <br />floorincations <br />i <br />61 <br />1" finersorntheaet <br />Dfytpatlwithiciatcgmpotrrrd <br />ooni'orerroo and office <br />walls and ceilings <br />area (and aatiaity <br />center east lobby), <br />2,000 <br />SF <br />-- <br />nutrition and kitchen <br />build out <br />62 <br />1" floor cantral w:ea <br />Plaator (button board - <br />build out (nutrition, <br />piaster/drywall) walls <br />3,000 <br />5F+ <br />. <br />$ ,u ZIZ <br />kitchen, storgos, <br />$ <br />of9luo and Xerox areas) <br />Tla`dooratgymnasiutn <br />Corrugated paperirnulailoh <br />lOb <br />SF <br />$ s^ <br />5-, <br />flooT <br />debris <br />6"t <br />1" floc gymnasium at <br />_ <br />Non -slip floor goating on Woad <br />floor <br />_ <br />�> <br />� <br />3,06 <br />upper oat walk/running <br />1,500 <br />Sts <br />$ , <br />-$ <br />balcony <br />65 <br />boor activityand <br />_ <br />Plpri l&ulatlon debris on <br />nutriflon moan, nrixod <br />with burned, moldy <br />ground andabove piping <br />] <br />$ <br />$ <br />_ <br />Aallen oeiliug materials <br />66 <br />2"' anc�oorwest <br />9-14oh grayflocr file and <br />50 <br />SF <br />stair landings <br />mastic <br />P-4 ofP-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.