My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MATRIX ENVIRONMENTAL, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
MATRIX ENVIRONMENTAL, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:20:35 PM
Creation date
11/29/2016 4:17:39 PM
Metadata
Fields
Template:
Contracts
Company Name
MATRIX ENVIRONMENTAL, INC.
Contract #
16-6876
Agency
Public Works
Council Approval Date
8/16/2016
Destruction Year
2021
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ,SANTA ANA <br />PROPOSAL Exhibit 2 <br />PROJECT NO,; 16-6876 <br />FORMER YMCA -MATERIALS ABATEMENT AND ENVIRONMENTAL, <br />REMEDIATION <br />Table G: Asbestos Containing Materials (Procedure 5 Plan) <br />Item <br />Location <br />Description <br />Quantity <br />Unit <br />Unit <br />Price <br />Amount <br />67 <br />2" floor west stair <br />Drywall withjoint compound at <br />30 <br />$ <br />'$ P <br />75 <br />Iaading wall build -out <br />ooiling <br />340 <br />SF <br />$1,,25 <br />Total Item 74-75; <br />(debris in stairwell <br />closet <br />68 <br />2" floor rostroom <br />Corrugated paper insulation <br />calling (debris at <br />ceiling deck and men's <br />40 <br />SF <br />j� <br />$' l 3n <br />7 q <br />$ < (..�. . <br />and woman's shower <br />area <br />69 <br />2° and 3" floor calling <br />TSI pipe <br />adjacent to restrooms <br />and pipe chase; <br />throughout north <br />central roof area (2"d <br />f <br />E <br />/31d level roof), north <br />150 <br />LF <br />$f s <br />. $ 4 <br />roof and wall area <br />(north side of gym at <br />2°a and ground level). <br />Debris observed below <br />dame ed elbow areas <br />70 <br />2" and 3T floor ceiling <br />Pipe elbows Insulation (and <br />area adjacent to <br />debris) <br />restrooms and pipe <br />chase;tbroughout <br />north central roof area <br />(2nd and 3"t level rood,y <br />40 <br />HA. <br />$ <br />\1 <br />and north roof and wall <br />$ it <br />areaPorthside of gym <br />at 2" and ground <br />level), Debris observed <br />below damaged elbow <br />areas <br />71 <br />3'& floor men's and <br />Drywall with joint compound <br />women's restroom <br />(including debris) <br />340 <br />SF <br />Z •7r"' <br />$J <br />$ <br />walls, Yd floor storage <br />closet calling <br />8 ud w Euildin <br />72 Northeast room on <br />Corrugated insulation debris <br />3 <br />SF <br />$ <br />$ <br />73 Cel t /f oor <br />Cementitious r in <br />--$ <br />Total Item 5573: <br />21-7,27f <br />Table l -L Alternate As Needed - { <br />Item <br />Location <br />Description <br />Quantity <br />Unit <br />_...L _.. <br />Unit <br />Price <br />Amount: <br />74 <br />Roof <br />Plywood <br />30 <br />$ <br />'$ P <br />75 <br />llasement <br />Liquid Disposal <br />4 <br />EA <br />Total Item 74-75; <br />- $ <br />P-5 of P-20 <br />W <br />FIN <br />0/0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.