My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - PD CAR COMPUTERS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
12/06/2016
>
25C - AGMT - PD CAR COMPUTERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 4:09:09 PM
Creation date
12/1/2016 2:57:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
25C
Date
12/6/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. Eaujoment Deliver <br />All equipment with the exception of the Getac V110 computers and Cradlepoint mobile routers is to be delivered <br />to Consultant's facility. Consultant will be responsible for receiving the equipment from the various sources. <br />Consultant will then deliver equipment as needed for installation to the Santa Ana Police Department located at <br />60 Civic Center Plaza, Santa Ana, CA 92701, <br />The Getac V110 computers and Cradlepoint mobile routers will be delivered directly from the manufacturers to <br />the Santa Ana Police Department located at 60 Civic Center Plaza, Santa Ana, CA 92701. City staff will be <br />responsible for receiving this equipment from the shipping company, The equipment shall be delivered as soon <br />as possible so that they may be prepared by City staff. <br />V. Project Kick -Off Meeting <br />After award of the Agreement, within one (1) week, a project kick-off meeting will be held with all of the <br />stakeholders from Consultant and City to come up with an initial schedule and tasks that will be required to <br />complete the project within the required six week time frame. <br />VI. Vehicle Specific Statement of Work. Wiring Plan. and Wireless Communication Test Procedure <br />Within two (2) weeks, Consultant will conduct site surveys and will create a statement of work ("SOW") for each <br />specific fleet vehicle designated for this project. The SOW details the vehicle type, hardware mounting locations, <br />equipment configuration, and other necessary instructions outlining the work to be performed for the City to <br />review and communicate any desired changes. City will provide staff to participate in the site surveys who are <br />empowered to make installation design decisions. <br />Consultant will also create vehicle specific wiring plans for each make of vehicle for City to review and <br />communicate any desired changes. Consultant and City will discuss and mutually agree upon a wireless <br />communications test procedure. <br />VII. Securitv Comoliance <br />Any and all of Consultant's employees will undergo a security/background check as specified by City. Within <br />two (2) weeks of this agreement becoming effective, Consultant will provide personal identifying information for <br />all personnel that will be working onsite at the Santa Ana Police Department during the initial installation process <br />to the Backgrounds Unit of the Santa Ana Police Department. City will complete security/background checks <br />prior to the scheduled beginning of installation. In the case that any of Consultant's personnel fail the <br />security/background check, City will notify Consultant at least one week prior to the beginning of installation work <br />so that Consultant can make other staffing arrangements. <br />All Consultant's employees will check in upon arrival and will follow all City and Santa Ana Police Department <br />rules and regulations. <br />VIII. Installation <br />Prior to installation work on the vehicles, Consultant's technicians will conduct a pre -inspection check of the <br />vehicle interior and exterior conditions and document any preexisting damage. <br />Consultant's technicians will take extra measures to guarantee that wires are connected using the most reliable <br />methods of ensuring positive circuit contract for long-term dependability. All considerations will be taken by <br />Consultant to ensure wires/cables are routed along proper paths or channels that offer the most protection and <br />also address tension relief to avoid potential disconnects or breakage. Wires/cables routed through the vehicles <br />25C-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.