My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20B - AA - STREETCAR DESIGN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
12/06/2016
>
20B - AA - STREETCAR DESIGN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 3:58:36 PM
Creation date
12/1/2016 3:51:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20B
Date
12/6/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual EXHIBIT 10.1{ <br />Consultant Certificntion of Contract Costs and Financial Management System <br />EXHIBIT 10-K CONSULTANT CERTIFICATION OF CONTRACT COSTS AND FINANCIAL <br />MANAGEMENT SYSTEM <br />(Note: If requesting to utilize the Safe Harbor Indirect Cost Rate submit Attachment 1 of <br />DLA -OB 13-07- Safe harbor Indirect Cost Rate for Consultant Contracts found at <br />http:/hvwrv.dot.ca,gov/liq/LocaiProgranes/DLA_OB/DLA_OB.htm in lieu ofthis farm,) <br />Certification of Final Indirect Costs: <br />Consultant Finn Name: Kimley-Horn and Associates Inc. <br />Indirect Cost Rate: 195.40% (Includes FCCM of 0.57%) *for fiscal period 111/15 to 12/31/15 <br />*Fiscal period covered for Indirect Cost Rate developed (not the contract period). <br />Local Government: City of Santa Ana <br />Contract Number: <br />Project Number: RFP N0, 16-125 <br />I, the undersigned, certify that I have reviewed the proposal to establish final indirect cost rates for the fiscal <br />period as specified above and to the best of my knowledge and belief: <br />1. All costs included in this proposal to establish final Indirect Cost Pates are allowable in <br />accordance with the cost principles of the Federal Acquisition Regulations (FAR) of Title 48, <br />Code of Federal Regulations (CFR), Part 31. <br />2. This proposal does not include any costs which are expressly unallowable under the cost <br />principles of the FAR of 48 CFR, Part 31. <br />All known material transactions or events that have occurred affecting the firm's ownership, organization, and <br />Indirect Cost Rates have been disclosed as of the date of proposal preparation noted above. <br />Certification of Financial Management System: <br />I, the undersigned, certify to the best of my knowledge and belief that our Financial Management System meets <br />the standards for financial reporting, accounting records, internal and budget control as set forth in the FAR of <br />Title 49, CFR, Part 18.20 to the extent applicable to Consultant, <br />Certification of Dollar Amount for all A&E Contracts: <br />I, the undersigned, certify that the approximate dollar amount of all A&E contracts awarded by Caltrans or a <br />California local agency to this firm within the last three (3) calendar years for all State DOT and Local Agencies <br />is—$38.5M (Transp./ITS/Transit') and the number of states in which the firm does business is 50 . <br />Certification of Direct Costs: <br />I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost <br />proposal(s) in this contract are reasonable, allowable and allocable to the contract in accordance with the cost <br />principles of the FAR of Title 48, CFR, Part 31. Allowable direct costs to a Government contract shall be: <br />Page 1 of 2 <br />LPP 15-01 January 14, 2015 <br />20B-39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.