My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - DELHI CHANNEL PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
12/06/2016
>
23A - PROJ - DELHI CHANNEL PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 4:04:21 PM
Creation date
12/1/2016 3:51:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
12/6/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Mtguel A. f�trtido <br />MAYOR PRO I EM <br />Vicente .Sam mento <br />ftfieli ahgwcun <br />P David 6onarvides <br />MiCtw,fc MarCinPB <br />Rom in Royna <br />SAI IlrwIaro <br />October 7, 2016 <br />CITY OF SANTA ANA <br />20 cwlf:('enter P9nza . P.0, Box 9SBII M -3f1 <br />Santa .Ann, Catiiornia. 92742 <br />(714) 64.7 -SOI 3 <br />TO: CONSTRUCTION CONTRACT BIDDERS <br />SUBJECT: PROJECT NO, 16-6467 SANTA ANA -DELHI CHANNEL DIvrnSioN <br />WY MANAGIG R <br />Dowd C`dVHZU4 <br />CITY AT'rC RNhY <br />Soma R. Canvallw <br />CLERK Of- U IE C0UM_''tL <br />Mona 1_ Hulzar <br />t <br />1(c,/' �,11 -, <br />The following changes have been made to the plans and specifications of the subject project. <br />1. The original Contract Documents and Addendums 1, 2, 3, 4, 5, 6, and 7 contain no changes. <br />Addendum 8 contains all changes with respect to the 'REBID". <br />2. Replace the Notice Inviting Bids with the attached REBID Notice Inviting Bids. <br />3. Amend Addendum Seven Special Provisions 3.00 Traffic Control with the attached Costa <br />Mesa Traffic Control Phasing plan. <br />4. Rename Special Provision Section 4.00 entitled "Special Provisions -- Storm Channel <br />Diversion Structure" as follows: <br />4.00 Special Provisions — Storm Channel Diversion Structure and Flood Control <br />Channel Modifications <br />5, Replace Special Provision Section 4.01 entitled "General" in its entirety with the following: <br />4.01 General <br />The CONTRACTOR responsible for the construction of the Storm Channel Diversion <br />Structure and the Flood Control Channel Modifications shall have a minimum of five years <br />history and experience, within the last ten years, constructing (1) Reinforced concrete flood <br />control channels; the experience shall be the same or substantially similar in size, scope, <br />and type of the flood control channel modifications for this project as depicted in the project <br />specifications, and (2) Reinforced concrete structures; the experience shall be the same or <br />substantially similar In size, scope, and type of the diversion structure for this project as <br />depicted in the project specifications. The CONTRACTOR shall have constructed and <br />satisfactorily completed a minimum of two (2) projects of reinforced concrete flood control <br />SANI A ANA CIT"Y COUN'•,'f L <br />i Ita A,mw.!-' 4,, ie- k 1 f mat <-.s Rt t fxpit I!,, 11,1 ut!r,V)li ol�t -ro,ttrr, ut�- <br />.c9•dh i nt t 7cY+.',f iz 1 x x nNk' <br />Nt1fq+ Adpt'-"Yu3 Yc++.r�.Ri- Va.. &r d:, hY •1 <br />( 11 14 V, a.L,0I + i tY: <br />23A-42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.