My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - DELHI CHANNEL PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
12/06/2016
>
23A - PROJ - DELHI CHANNEL PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 4:04:21 PM
Creation date
12/1/2016 3:51:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
12/6/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the comments or items, NEWPORT BEACH shall have its Project Representative provide <br />written approval to SANTA ANA that the Facilities have been constructed in accordance with <br />the Approved Plans or are otherwise acceptable. <br />4.6 Contribution <br />4.61 Within forty (40) days of the execution of this Agreement, 'NEWPORT BEACH shall <br />deposit a lump sum amount of ONE MILLION, FNE-HUNDRED THOUSAND DOLLARS <br />and 00/100 ($1,500,000.00), as established per Exhibit C3, into the Project Fund Account. <br />4.6.2 After exhaustion of the Initial O&M Deposit, NEWPORT BEACH agrees to contribute <br />to long term 0&M costs per its joint proportionate share as specified in Exhibit C2. <br />SECTION 5 <br />RESPONSIBILITIES OF COSTA MESA <br />5.1 General Responsibilities <br />COSTA MESA shall review the Project plans and financially contribute toward the Project Fund <br />as shown in Exhibit C2. In furtherance of the Project, Costa Mesa may include the installation <br />of a segment of the Project's force main in conjunction with one of their City's current <br />construction contracts. In this case, costs to construct this portion shall off -set its financial <br />contribution shown in Exhibit C2. Upon completion of the Project, COSTA MESA shall take <br />ownership, ongoing long-term O&M responsibilities for the Project force main or pipeline, <br />excluding those portions which are part of the Facilities located on OCFCD, COUNTY and/or <br />JWA right-of-way. <br />52 Environmental Review / Permitting. <br />COSTA MESA shall comply with all of the commitments and conditions set forth in the <br />environmental documentation, environmental permits, approvals, and applicable agreements <br />obtained for the Project as those commitments and conditions apply to its responsibilities tinder <br />this Agreement. Notwithstanding the foregoing, COSTA MESA through its designated Project <br />Representative shall review and approve all permit conditions and other resource agency <br />approvals that affect the construction and O&M of those portions of the Facilities not on <br />OCFCD, COUNTY and/or JWA right-of-way as to its respective compliance with applicable <br />Regulations. <br />5,3 Design <br />COSTA MESA shall review all draft and final Project design reports, and PS&E submitted for <br />its approval and have its Project Representative respond in writing to SANTA ANA in a timely <br />manner. Subsequent to approval of the final design, any material design change variance shall <br />require mutual approval by the Project Representatives. <br />Santa. Ana -Delhi Channel Diversion Project Agreement D15-013 Page 24 of 59 <br />23A-76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.